2015-04-28A fabric filter system for the furnace gas line 1 — the Incineration plant located in Rådalen in Bergen municipality (BIR Avfallsenergi AS)
The furnace gas cleaning system at BIR AS' line 1 has been in operation in 16 years and parts of the system shall be renovated and replaced due to wear and corrosion.
The modifications on the WTE line BIR 1 that shall be implemented in this tender are:
— A new connection to the flue duct upstream of the fabric filter;
— A new injection system for adsorbent and recycled flue dust upstream the fabric filter;
— A new fabric filter;
— A new system for transportation of flue dust and used sorbent to the …
Vis anskaffelsen » Nevnte leverandører:Envirotherm GmbH
2012-10-16Collection and treatment of untreated wood (BIR Avfallsenergi AS)
The assignment includes the reception and treatment of untreated wood, approximately 12 000 metric tons per year.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=270486.
Vis anskaffelsen » Nevnte leverandører:Ragn-Sells As