2021-12-06   190288 - New Mo i Rana Airport - Turnkey contractor (Avinor AS)
See the tender documentation. The contract´s scope The contracting authority is Avinor AS, organisation no. 985 198 292. The invitation to tender concerns the procurement of a turnkey contract for the development of the new Mo i Rana airport where partnering contracting is the model contract. Contract period: The works are expected to be initiated during the second quarter of 2022 and the contract is valid until the project is completed and handed over to Avinor’s operational organisation. See Annex A1 … Vis anskaffelsen »
Nevnte leverandører: AF Gruppen Norge AS, AF Anlegg
2020-05-25   189255 — Tromsø Airport — Terminal with Aprons (Avinor AS)
New terminal, aprons, land side works and demolition. Vis anskaffelsen »
2015-09-15   Pre-qualification- Outdoor works — FBKB Maintenance building — ØHF — Contract 852050 (Forsvarsbygg (The Norwegian Defence Estates Agency))
The project includes preparation of associated infrastructure and outdoor areas. The project is divided into several contracts the contract will mainly consist of: — Foundation works. — Laying of asphalt and concrete track cover and flight operations surfaces. — Delivery and laying of Surface Water pipes. — Establishment of roads — Construction of embankments and perimeter security — Site gardening works. Vis anskaffelsen »
Nevnte leverandører: Tore Løkke AS
2015-06-09   15/07624 Framework agreement for maintenance services — Bergen airport Flesland (Avinor AS)
Avinor and Bergen airport Flesland intend to enter into framework agreement and a good co-operation with a robust tenderer who has a broad competence in different specialist fields in connection to the maintenance of asphalt, concrete, marking paint, green areas, etc. See the qualification document and orientation about the procurement. Vis anskaffelsen »
2014-12-03   The conveying of the main infrastructure to F-35 (Forsvarsbygg)
Project 5000408 main infrastructure work for F-35 comprises the excavation of a large ditch, partially deep and wide, as well as the delivery and laying of waste water pipelines, surface water pipelines, water pipelines, high-tension electricity cables, district heating and remote cooling pipes and ICT drawing pipes. Development of a street and pavement on parts of the ditch route. The contract will mainly consist of: — Foundation works. — Roadworks. — Delivery and laying of water pipelines. — Delivery … Vis anskaffelsen »
Nevnte leverandører: THOR GJUL AS
2013-06-06   T3 Avinor Flesland 80301 Sealed building (Avinor AS)
80301 – Sealed building. The expected and provisional extent of work and services for contract 80301. 80301 will take over a ready levelled construction hollow after the matter removal contract (80401). 80301 then is responsible for erecting a sealed building that comprises the framework (ground, foundations and supporting system) as well as facade works for the new terminal Flesland. The contract also comprises technical infrastructure that shall be laid in the ground under the building as well as … Vis anskaffelsen »
2013-03-12   201210586 - Site gardener Stor-Oslo (Jernbaneverket)
Procurement of site gardener services at Jernbaneverket's 57 stations in Stor Oslo. Vis anskaffelsen »
Nevnte leverandører: Bis Maskin A/S
2012-12-05   2012034007. Framework agreement Urea (Forsvarets logistikkorganisasjon (FLO))
Framework agreement for the delivery of technically conditioned Urea for de-icing runways. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=275189. Vis anskaffelsen »
Nevnte leverandører: 984015666
2012-03-05   Kristiansund Airport Kvernberget-Infrastructure (prequalification) (Avinor AS)
With the new planned buildings and design of the airport, a new infrastructure must be established before new buildings are to be constructed and in operation. The new construction and development of new building shall be totally independent on the existing normal operation. In order to make this feasible, the Awarding Authority has chosen to divide the terminal area in 3 zones and stages. I.a. technical culvert which shall prevent excavation of existing helicopter decks as the various stages are … Vis anskaffelsen »