Nyeste anskaffelser av telemetriovervåkningssystem i Norge
2026-02-03Telemetry equipment (NORCE Research AS)
The Buyer wishes to enter into parallel Framework Agreements with suppliers. NORCE LFI, The Laboratory of Freshwater Ecology and Inland Fisheries (the Buyer), intends to procure acoustic transmitters and additional acoustic receivers for research-based tracking of fish in aquatic environments. The equipment will be used in both freshwater and marine systems, encompassing a wide range of environmental conditions, including temperatures from below freezing to approximately 30 °C, and at depths exceeding …
Vis anskaffelsen » Nevnte leverandører:Innovasea Marine Systems Canada Inc.Thelma Biotel AS
2013-07-112013/1385 - Monitoring equipment for intensive care and emergency department, Kristiansund hospital (Helse Møre og Romsdal HF)
The tender is for the procurement of monitoring equipment for the surgical clinic, Kristiansund Hospital, intenstive care and emergency department sections, in accordance with the specifications. The contract shall also include a telemetry system with an exchange in intensive care, which shall cover Kristiansund Hospital in accordance with the specifications.
Otherwise the contract shall include all components/accessories, assembly/installation and completion so that it functions as a whole based on the …
Vis anskaffelsen »
2013-07-09Monitoring and telemetering equipment (Sykehuset Innlandet HF)
Procurement of monitoring and telemetering equipment.
Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at: http://www.doffin.no/Search/Search_Switch.aspx?ID=300025
Vis anskaffelsen »
2013-01-07MTU/2013/Project 000541 Monitoring and telemetry equipment (Helse Bergen HF)
Helse Bergen HF, hereafter called the awarding authority, currently has approx. 400 multi-monitors and 19 centres for medical monitoring of unstable patients, critically ill patients and patients having an operation or other treatment.
Helse Bergen HF hopes that the replacements shall occur during the coming 4 to 6 years, but this is not a final and binding schedule for the replacement rate.
The telemetry installations for radio based heart monitoring and diagnosing at Haukeland University Hospital and …
Vis anskaffelsen »