2012-05-14
Vittingfoss generator 5 - control and switchgear (Ringeriks-Kraft Produksjon AS)
โ Complete switchgear and control gear, high voltage and low voltage including direct current system and earthing, โ 17MVA generator transformer (6.6/66kV), โ Design, installation, commissioning of the system as well as documentation. Vis anskaffelsen ยป
โ Complete switchgear and control gear, high voltage and low voltage including direct current system and earthing, โ 17MVA generator transformer (6.6/66kV), โ Design, installation, commissioning of the system as well as documentation. Vis anskaffelsen ยป
2012-04-04
VIttingfoss 5 - supply and assembly of generator (Ringeriks-Kraft Produksjon AS)
Ringeriks-Kraft Produksjon AS has decided to build a new unit 5 of the Vittingfoss Kraftstasjon (Power Station). The extension is planned in a new building connected to the existing power station. Ringeriks-Kraft Produksjon AS shall purchase a 3-phase 50Hz generator directly driven by a vertical Kaplan turbine: โ Total capacity 17 MVA, โ Synchronous rotational speed 187,5 rpm, โ Construction type IEC 60034 IM 8221 or IM 8421, โ Maximum speed: speed synchro x 2.6, โ Requirements for corner lots: GD2> 320 โฆ Vis anskaffelsen ยป
Ringeriks-Kraft Produksjon AS has decided to build a new unit 5 of the Vittingfoss Kraftstasjon (Power Station). The extension is planned in a new building connected to the existing power station. Ringeriks-Kraft Produksjon AS shall purchase a 3-phase 50Hz generator directly driven by a vertical Kaplan turbine: โ Total capacity 17 MVA, โ Synchronous rotational speed 187,5 rpm, โ Construction type IEC 60034 IM 8221 or IM 8421, โ Maximum speed: speed synchro x 2.6, โ Requirements for corner lots: GD2> 320 โฆ Vis anskaffelsen ยป
2011-05-30
Vittingfoss Generator 5 - Turbine (Ringeriks-Kraft Produksjon AS)
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station, and is now considering installation of a new Kaplan (water) turbine located beside the existing power station. The Awarding Authority therefore wishes to procure a turbine to Vittingfoss Power station with the following main data: Nominal drop H=19, 5 m. Total maximum useable flow Q in the area 65-80 mยณ/s. The tenderer shall give tenders for minimum one โฆ Vis anskaffelsen ยป
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station, and is now considering installation of a new Kaplan (water) turbine located beside the existing power station. The Awarding Authority therefore wishes to procure a turbine to Vittingfoss Power station with the following main data: Nominal drop H=19, 5 m. Total maximum useable flow Q in the area 65-80 mยณ/s. The tenderer shall give tenders for minimum one โฆ Vis anskaffelsen ยป
2011-05-30
Vittingfoss Generator 5 - new power station building and construction works (Ringeriks-Kraft Produksjon AS)
In close vicinity of the existing Vittingfoss Power Station a new power station shall be constructed - Vittingfoss generator 5. The building and construction contract will include: โ draining of the inlet area, โ demolition of the existing dam, โ excavating and blasting, โ concrete works in connection with a new dam, โ concrete works inlet and head race, โ concrete works around the kaplan (water) turbine and generator, โ concrete works in draft tube, โ delivery of the power stationโs building, โ concrete โฆ Vis anskaffelsen ยป
In close vicinity of the existing Vittingfoss Power Station a new power station shall be constructed - Vittingfoss generator 5. The building and construction contract will include: โ draining of the inlet area, โ demolition of the existing dam, โ excavating and blasting, โ concrete works in connection with a new dam, โ concrete works inlet and head race, โ concrete works around the kaplan (water) turbine and generator, โ concrete works in draft tube, โ delivery of the power stationโs building, โ concrete โฆ Vis anskaffelsen ยป
2011-05-30
Vittingfoss Generator 5 - Generator (Ringeriks-Kraft Produksjon AS)
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station. The expansion is planned to include a new building in open air situated beside the existing power plant. A technical financial analyse has been executed and it is decided that a vertical Kaplan (water) turbine should be selected. The Awarding Authority therefore wishes to procure a 3 phase 50Hz generators directly operated by a vertical Kaplan (water) โฆ Vis anskaffelsen ยป
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station. The expansion is planned to include a new building in open air situated beside the existing power plant. A technical financial analyse has been executed and it is decided that a vertical Kaplan (water) turbine should be selected. The Awarding Authority therefore wishes to procure a 3 phase 50Hz generators directly operated by a vertical Kaplan (water) โฆ Vis anskaffelsen ยป