Nyeste anskaffelser av hydrauliske turbiner i Norge
2016-06-23Ramfoss Power Plant — Renovation of turbines (Ramfoss Kraftlag)
Ramfoss Power Plant is equipped with 3 Francis turbines from 1960 and 1970 (P = 10 MW, H = 22,5 m, Q = 50 m3/s and n = 150 rpm). The turbines shall be renovated and services for complete renovation of all 3 turbines shall be procured.
Possibly installation of new runners as a part of the renovation contract will be considered during the process. Option prices for new runners will therefore be a part of the procurement process.
Vis anskaffelsen » Nevnte leverandører:Rainpower Norge AS
2014-06-21Service contract(s) for turbines (Oslo kommune, Energigjennvinningsetaten)
The Norwegian Waste to Energy Agency needs to enter into service contracts for respectively MAN MARC 2 turbine and Siemens V25 turbine. The service contract(s) will include support, annual inspection, minor/major overhaul and repairs, as well as the supply of spare parts.
Vis anskaffelsen »
2012-02-16Electromechanical equipment for Istad Hydro Plant, Langli Hydro Plant and Grønnedal Hydro plant (Istad Kraft AS)
Complete electromechanical equipment to three hydro power plants.
Istad Hydroplant, Q=2,8 m3/s, H=150 m.
Langli Hydroplant, Q=3,2 m3/s, H=40 m. (option).
Grønnedal Hydroplant, alternative 1, Q=3,2 m3/s, H=64 m. (option).
Grønnedal Hydroplant, alternative 2, refurbishment of Grønnedal hydro plant, Q=3,0 m3/s, H=64 m (option).
Main data for the electromechanical equipment and scope of work may be altered somewhat until the Tender Documents are completed.
NOTE: To register your interest in this notice and …
Vis anskaffelsen »
2012-01-23Fagerbakken power station - electro mechanical delivery (5112635) (SISO Energi AS)
— 1 Pelton turbine, maximum operating flow 1,4 m3/s, gross head approximately 426 m,
— 1 Synchronous generator, power approx. 5,5 MVA,
— 1 Power transformer, transformation 6,6/22 kV,
— High-voltage switch-gear,
— 22 kV power cables,
— Station supply in the power station,
— Low voltage supply at the dam,
— Control and protection system,
— Cooling water and drainage equipment,
— Lifting equipment,
— Spare parts.
Note: To register your interest in this notice and obtain any additional information please …
Vis anskaffelsen »
2012-01-05Kvitvella power station - electro-mechanical delivery (5112090) (Valdres Energiverk AS)
— 1 Kaplan turbine, Q0 = 10,5 m3/s, gross head approx. 15,5 m,
— 1 generator, power approx 1,5 MVA,
— Transformer, ratio (kV) 0.69/22,
— Control and switch gear,
— Cooling and drainage facilities,
— Cable installations,
— Intake cone with connection to pipe,
— Electrotechnical equipment by the dam.
Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=246957.
Vis anskaffelsen »
2011-10-03Haukland power station - 1 x Francis unit complete (Dalane Kraft AS)
1 x horizontal Francis unit shall be supplied. The new unit shall be placed in a new, separate station in the immediate vicinity of the existing power station. Complete electro-mechanical package;
1 x Francis turbine, maximum operating flow (Qmax) 2,2 m3/s, net head (He) 246 m, rotational speed (n) 1 000 rpm;
1 x generator, output approx. 5,5 MVA (cos phi = 0,9), voltage 6,6 kV;
Control equipment;
1 x transformer, approx. 6,0 MVA, 6,6/15,0/22,0 kV;
Main stop valve;
Expected average production approx. 20 …
Vis anskaffelsen »
2011-05-30Vittingfoss Generator 5 - Turbine (Ringeriks-Kraft Produksjon AS)
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station, and is now considering installation of a new Kaplan (water) turbine located beside the existing power station.
The Awarding Authority therefore wishes to procure a turbine to Vittingfoss Power station with the following main data:
Nominal drop H=19, 5 m.
Total maximum useable flow Q in the area 65-80 m³/s.
The tenderer shall give tenders for minimum one …
Vis anskaffelsen »