Anskaffelser: Hydrauliske turbiner
8 arkiverte anskaffelser
Hydrauliske turbiner har blitt anskaffet av organisasjoner som Dalane Kraft AS, Høgskolen i Sør-Trøndelag og Istad Kraft AS.
Historisk har leverandører innenfor dette området vært DevinSense AB, Elfgren Faaltstroem Trollsaas AB, EOS GmbH, GUNT Geraetebau GmbH, Holger Hartmann AS, Inter Instrument AS, Matriks AS, Micronova As, Rainpower Norge AS og ST Instruments BV.
- Industrimaskiner (>20 nye anskaffelser)
- Maskiner til produksjon og utnyttelse av mekanisk energi (3)
- Turbiner og motorer
- Turbin anlegg
- Hydrauliske turbiner ⬅️
Nyeste anskaffelser av hydrauliske turbiner i Norge
2016-06-23
Ramfoss Power Plant — Renovation of turbines (Ramfoss Kraftlag)
Ramfoss Power Plant is equipped with 3 Francis turbines from 1960 and 1970 (P = 10 MW, H = 22,5 m, Q = 50 m3/s and n = 150 rpm). The turbines shall be renovated and services for complete renovation of all 3 turbines shall be procured. Possibly installation of new runners as a part of the renovation contract will be considered during the process. Option prices for new runners will therefore be a part of the procurement process. Vis anskaffelsen »
Ramfoss Power Plant is equipped with 3 Francis turbines from 1960 and 1970 (P = 10 MW, H = 22,5 m, Q = 50 m3/s and n = 150 rpm). The turbines shall be renovated and services for complete renovation of all 3 turbines shall be procured. Possibly installation of new runners as a part of the renovation contract will be considered during the process. Option prices for new runners will therefore be a part of the procurement process. Vis anskaffelsen »
2015-12-22
Laboratory equipment (Høgskolen i Sør-Trøndelag)
For a New Technology building the following Laboratory Equipment shall be purchased: — 3D Printers and scanners — Robots; drones and vision systems — Material technology — Thermodynamics — Flow Mechanics — Workshop Technology — Measuring Equipment. Vis anskaffelsen »
For a New Technology building the following Laboratory Equipment shall be purchased: — 3D Printers and scanners — Robots; drones and vision systems — Material technology — Thermodynamics — Flow Mechanics — Workshop Technology — Measuring Equipment. Vis anskaffelsen »
2014-06-21
Service contract(s) for turbines (Oslo kommune, Energigjennvinningsetaten)
The Norwegian Waste to Energy Agency needs to enter into service contracts for respectively MAN MARC 2 turbine and Siemens V25 turbine. The service contract(s) will include support, annual inspection, minor/major overhaul and repairs, as well as the supply of spare parts. Vis anskaffelsen »
The Norwegian Waste to Energy Agency needs to enter into service contracts for respectively MAN MARC 2 turbine and Siemens V25 turbine. The service contract(s) will include support, annual inspection, minor/major overhaul and repairs, as well as the supply of spare parts. Vis anskaffelsen »
2012-02-16
Electromechanical equipment for Istad Hydro Plant, Langli Hydro Plant and Grønnedal Hydro plant (Istad Kraft AS)
Complete electromechanical equipment to three hydro power plants. Istad Hydroplant, Q=2,8 m3/s, H=150 m. Langli Hydroplant, Q=3,2 m3/s, H=40 m. (option). Grønnedal Hydroplant, alternative 1, Q=3,2 m3/s, H=64 m. (option). Grønnedal Hydroplant, alternative 2, refurbishment of Grønnedal hydro plant, Q=3,0 m3/s, H=64 m (option). Main data for the electromechanical equipment and scope of work may be altered somewhat until the Tender Documents are completed. NOTE: To register your interest in this notice and … Vis anskaffelsen »
Complete electromechanical equipment to three hydro power plants. Istad Hydroplant, Q=2,8 m3/s, H=150 m. Langli Hydroplant, Q=3,2 m3/s, H=40 m. (option). Grønnedal Hydroplant, alternative 1, Q=3,2 m3/s, H=64 m. (option). Grønnedal Hydroplant, alternative 2, refurbishment of Grønnedal hydro plant, Q=3,0 m3/s, H=64 m (option). Main data for the electromechanical equipment and scope of work may be altered somewhat until the Tender Documents are completed. NOTE: To register your interest in this notice and … Vis anskaffelsen »
2012-01-23
Fagerbakken power station - electro mechanical delivery (5112635) (SISO Energi AS)
— 1 Pelton turbine, maximum operating flow 1,4 m3/s, gross head approximately 426 m, — 1 Synchronous generator, power approx. 5,5 MVA, — 1 Power transformer, transformation 6,6/22 kV, — High-voltage switch-gear, — 22 kV power cables, — Station supply in the power station, — Low voltage supply at the dam, — Control and protection system, — Cooling water and drainage equipment, — Lifting equipment, — Spare parts. Note: To register your interest in this notice and obtain any additional information please … Vis anskaffelsen »
— 1 Pelton turbine, maximum operating flow 1,4 m3/s, gross head approximately 426 m, — 1 Synchronous generator, power approx. 5,5 MVA, — 1 Power transformer, transformation 6,6/22 kV, — High-voltage switch-gear, — 22 kV power cables, — Station supply in the power station, — Low voltage supply at the dam, — Control and protection system, — Cooling water and drainage equipment, — Lifting equipment, — Spare parts. Note: To register your interest in this notice and obtain any additional information please … Vis anskaffelsen »
2012-01-05
Kvitvella power station - electro-mechanical delivery (5112090) (Valdres Energiverk AS)
— 1 Kaplan turbine, Q0 = 10,5 m3/s, gross head approx. 15,5 m, — 1 generator, power approx 1,5 MVA, — Transformer, ratio (kV) 0.69/22, — Control and switch gear, — Cooling and drainage facilities, — Cable installations, — Intake cone with connection to pipe, — Electrotechnical equipment by the dam. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=246957. Vis anskaffelsen »
— 1 Kaplan turbine, Q0 = 10,5 m3/s, gross head approx. 15,5 m, — 1 generator, power approx 1,5 MVA, — Transformer, ratio (kV) 0.69/22, — Control and switch gear, — Cooling and drainage facilities, — Cable installations, — Intake cone with connection to pipe, — Electrotechnical equipment by the dam. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=246957. Vis anskaffelsen »
2011-10-03
Haukland power station - 1 x Francis unit complete (Dalane Kraft AS)
1 x horizontal Francis unit shall be supplied. The new unit shall be placed in a new, separate station in the immediate vicinity of the existing power station. Complete electro-mechanical package; 1 x Francis turbine, maximum operating flow (Qmax) 2,2 m3/s, net head (He) 246 m, rotational speed (n) 1 000 rpm; 1 x generator, output approx. 5,5 MVA (cos phi = 0,9), voltage 6,6 kV; Control equipment; 1 x transformer, approx. 6,0 MVA, 6,6/15,0/22,0 kV; Main stop valve; Expected average production approx. 20 … Vis anskaffelsen »
1 x horizontal Francis unit shall be supplied. The new unit shall be placed in a new, separate station in the immediate vicinity of the existing power station. Complete electro-mechanical package; 1 x Francis turbine, maximum operating flow (Qmax) 2,2 m3/s, net head (He) 246 m, rotational speed (n) 1 000 rpm; 1 x generator, output approx. 5,5 MVA (cos phi = 0,9), voltage 6,6 kV; Control equipment; 1 x transformer, approx. 6,0 MVA, 6,6/15,0/22,0 kV; Main stop valve; Expected average production approx. 20 … Vis anskaffelsen »
2011-05-30
Vittingfoss Generator 5 - Turbine (Ringeriks-Kraft Produksjon AS)
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station, and is now considering installation of a new Kaplan (water) turbine located beside the existing power station. The Awarding Authority therefore wishes to procure a turbine to Vittingfoss Power station with the following main data: Nominal drop H=19, 5 m. Total maximum useable flow Q in the area 65-80 m³/s. The tenderer shall give tenders for minimum one … Vis anskaffelsen »
Ringeriks-Kraft Produksjon AS, henceforth referred to as the Awarding Authority, has been provided concession for expansion of Vittingfoss Power Station, and is now considering installation of a new Kaplan (water) turbine located beside the existing power station. The Awarding Authority therefore wishes to procure a turbine to Vittingfoss Power station with the following main data: Nominal drop H=19, 5 m. Total maximum useable flow Q in the area 65-80 m³/s. The tenderer shall give tenders for minimum one … Vis anskaffelsen »