The port of Husøy was last dredged in the 1980s and is currently too shallow to meet the needs of modern fishing vessels. The depth conditions pose a challenge for both the fishing fleet and the land industry. The Norwegian Coastal Administration has, therefore, been given the task of deepening the harbour basin to a depth of 8.3 metres, so that larger vessels can tarnish safely. The plan involves dredging both clean and polluted matter, which shall partly be used to expand the land area and establish new infrastructure for the fishing industry.
Frist
Fristen for mottak av tilbud var 2025-09-08.
Anskaffelsen ble publisert 2025-07-04.
Kunngjøring av konkurranse (2025-07-04) Gjenstand Anskaffelsens omfang
Tittel: Husøy Fishing Port
Referansenummer: 2023/2486
Kort beskrivelse:
“The port of Husøy was last dredged in the 1980s and is currently too shallow to meet the needs of modern fishing vessels. The depth conditions pose a...”
Kort beskrivelse
The port of Husøy was last dredged in the 1980s and is currently too shallow to meet the needs of modern fishing vessels. The depth conditions pose a challenge for both the fishing fleet and the land industry. The Norwegian Coastal Administration has, therefore, been given the task of deepening the harbour basin to a depth of 8.3 metres, so that larger vessels can tarnish safely. The plan involves dredging both clean and polluted matter, which shall partly be used to expand the land area and establish new infrastructure for the fishing industry.
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Oppmudring og pumpearbeid📦 Beskrivelse
Beskrivelse av anskaffelsen:
“The port of Husøy was last dredged in the 1980s and is currently too shallow to meet the needs of modern fishing vessels. The depth conditions pose a...”
Beskrivelse av anskaffelsen
The port of Husøy was last dredged in the 1980s and is currently too shallow to meet the needs of modern fishing vessels. The depth conditions pose a challenge for both the fishing fleet and the land industry. The Norwegian Coastal Administration has, therefore, been given the task of deepening the harbour basin to a depth of 8.3 metres, so that larger vessels can tarnish safely. The plan involves dredging both clean and polluted matter, which shall partly be used to expand the land area and establish new infrastructure for the fishing industry.
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2025-09-08 11:00:00 📅
Vilkår for åpning av tilbud: 2025-09-08 11:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3
Utfyllende informasjon Klageinstans
Navn: KOFA Klagenemd for offentlige anskaffelser
Nasjonalt registreringsnummer: 932136279
Postnummer: 5805
Poststed: Bergen
Region: Vestland🏙️
Land: Norge 🇳🇴 Tjeneste hvor informasjon om klageprosedyren kan innhentes
Navn: KOFA Klagenemd for offentlige anskaffelser
Nasjonalt registreringsnummer: 932136279
Postnummer: 5805
Poststed: Bergen
Region: Vestland🏙️
Land: Norge 🇳🇴 Klageprosedyre
Presis informasjon om frister for klageprosedyrer:
“The contracting authority shall not enter into a contract until the waiting period has expired, cf. the Public Procurement Regulations § 25-2 (1). The...”
Presis informasjon om frister for klageprosedyrer
The contracting authority shall not enter into a contract until the waiting period has expired, cf. the Public Procurement Regulations § 25-2 (1). The waiting period cf. point 1.4. The deadline is calculated from the day after the notification has been sent out.
Vis mer Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk betaling vil bli brukt
Kilde: OJS 2025/S 127-440825 (2025-07-04)
Kunngjøring av konkurranse (2025-07-09)
Endringer Annen tilleggsinformasjon
“The annex documents contained two files with the same name, D01 and D01 (Coastal Engineering 07). The document that was uploaded 02.07.2025 at 08.06 has now...”
The annex documents contained two files with the same name, D01 and D01 (Coastal Engineering 07). The document that was uploaded 02.07.2025 at 08.06 has now been deleted and the document uploaded on 03.07.2025 at 14.16 is left.
D01 - 52305087-Kystteknikk 07 - Site execution and control plan - Husøy port D02.pdf 1 03.07.2025 14.16 D01 - 52305087-Kystteknikk 07 - Site execution and control plan - Husøy port D02.pdf 1 02.07.2025 08.06