2023-02-08   Contract 7300 Water pipe 600 - Prequalification - Project Nye Aker (Helse Sør-Øst RHF)
The purpose of the contract is to engage a contractor for contract 7300 Alteration of Water pipe 600 for the Project Nye Aker who is responsible for the executed work. Click here: https://permalink.mercell.com/196297626.aspx Vis anskaffelsen »
Nevnte leverandører: Marthinsen & Duvholt AS
2022-11-07   NSD 7010 – Municipal roads and water/sewage in Lier (Lier Vei, Vann og Avløp Kf)
The contest concerns Contract 7010 "Municipal roads and water/sewage in Lier". The project includes the establishment of a flood-proof access road to the hospital from Strandbrua and the opening of Nøstebekken. The undertaking includes Water/Sewage, Electrical and Road technical infrastructure and green areas in connection with the opening of Nøstebekken. Contract 7010 has interfaces with other parties and adjacent projects. The work must be carried out as a general contract where the contractor who is … Vis anskaffelsen »
Nevnte leverandører: Marthinsen & Duvholt AS
2022-08-16   Pipeline installations Svadde - Tinnsjøen, turnkey contract (Tinn kommune)
The contest is for new installations of an emission pipeline (wastewater pipeline), 3 pump stations, and a stretch with a submarine pipeline. The pipeline will go from a new factory (HIMA Seafood AS) at Svadde, along Måna and out in the Tinn Lake. The pipeline will lead sewage water from HIMA Seafood AS and from a future new municipal treatment plant. The pipeline length is approx. 12 km. New municipal water and sewage pipelines will also be laid on parts of the stretch. The value of the procurement is … Vis anskaffelsen »
Nevnte leverandører: Marthinsen & Duvholt AS
2017-04-11   Renovation of Nordby and Smiehagen tunnels, the Norwegian Public Roads Administration, Eastern Region (Statens vegvesen Region øst)
Nordby tunnel was opened in 1992 with two tunnels, each with 2 lanes in the same direction. The tunnels has 5 technical rooms, of which 3 are located in the tunnel. The tunnel's total length is 3,850 metres. Smiehagen tunnel was opened in 1999 with one tunnel with two lanes in one direction. The tunnel has a technical room that is located in the open air (above the tunnel). The tunnel's total length is 892 metres. The work involves a complete renovation of Nordby and Smeihage tunnels on the E6 in Follo. … Vis anskaffelsen »
Nevnte leverandører: Marthinsen & Duvholt AS
2016-08-29   Preparatory measures Rugtvedt Dørdal (Nye Veier)
Deforestation and construction of access roads LKL 3 in connection with the construction of a new E18 (European road 18) between Rugtvedt-Dørdal. Vis anskaffelsen »
Nevnte leverandører: Marthinsen & Duvholt AS
2016-08-15   Sandefjord Airport — Renovation and upgrading of the runway (Rambøll Norge AS)
Asphalt spreading works and other facilities in connection with the renovation and upgrading of the runway. Vis anskaffelsen »
Nevnte leverandører: Marthinsen & Duvholt AS