2015-04-28A fabric filter system for the furnace gas line 1 — the Incineration plant located in Rådalen in Bergen municipality (BIR Avfallsenergi AS)
The furnace gas cleaning system at BIR AS' line 1 has been in operation in 16 years and parts of the system shall be renovated and replaced due to wear and corrosion.
The modifications on the WTE line BIR 1 that shall be implemented in this tender are:
— A new connection to the flue duct upstream of the fabric filter;
— A new injection system for adsorbent and recycled flue dust upstream the fabric filter;
— A new fabric filter;
— A new system for transportation of flue dust and used sorbent to the …
Vis anskaffelsen » Nevnte leverandører:Envirotherm GmbH