2023-03-29Procurement of a partnering contractor for the longitudinal water and sewage project (Nittedal kommune)
Nittedal Municipality and NRVA have joined together for the project 'longitudinal water and sewage' in order to establish pump pipelines for sewage from Åneby and Rotnes to Slattum, pump stations at Rotnes and Åneby, and to establish new main water pipelines for NRVA on parts of the stretch between Slattum and Åneby, See the partnering contract annex A2 Project Description for further details on the contract work.
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As
2020-10-01211432 Skallum — Tjernsrud Separation (Bærum kommune)
The project includes the separation of approx. 850 metres AF 800 to OV1000 and SP800 The main pipeline route is basically located on private properties and in an area that is subsidence-sensitive. Ground stabilising measures for the main route are extensive and include sheet piling in rock, floating sheet piles, pipe piles, lime/concrete stabilisation and a trench box. There will be a need for overpumping past the construction site for large parts of the construction works.
The project also includes the …
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As
2019-12-16Contract 7006 Alteration of infrastructure (Helse Sør-Øst RHF)
The project New Hospital in Drammen [Norwegian abbreviation PNSD] includes buildings with a total area of approx. 122 000 m. The site is 50 acres [150 mål], and is located in the existing industrial area at Brakerøya as far as Drammenselva and near the railway station. The construction works were initiated during autumn 2019. The Hospital must be ready for operation during June 2024.
Contract 7006 includes alteration of the infrastructure in connection with the establishment of a new driveway culvert …
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As
2017-11-24Cycle lane Professor Kohts vei (Statens vegvesen)
The project includes the development of a two-sided cycle lane as well as a one-sided pavement. Exit roads and side roads shall be adapted to the new traffic situation. The current retaining walls along the north side of Prof. Kohts shall be replaced. New retaining walls along the south side shall be constructed.
Cast-on-site walls and stacking walls with soil reinforcement shall be constructed. Piling under wall S1 is included.
The stretch is approx. 1 250 m long. A new road light system shall be …
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As
2017-03-22Contract: County Road 168 Griniveien, Eiksveien — Oslo border (Statens vegvesen Region øst)
Construction of approx. 1 000 metres of foot and bicycle path along Fv. 168 (County Road 168) Griniveien from Eiksveien to the Oslo border. An existing culvert east of Vollsveien shall be demolished and removed, and a new culvert shall be established. A roundabout shall be built In the junction between County Road 168 Griniveien and Vollsveien. The project includes water and sewage works for Bærum kommune. A large, natural stone retaining wall shall be established.
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As
2016-06-30Hunstok Akersvann 2, sub-section 2 of section 2; Kihle Bridge — PV Stokke (Vestfold Vann IKS)
Vestfold Vann IKS shall complete the replacement of an old concrete water main between Hunstok in Sandefjord and Akersvannet in Stokke. This is the second sub-section of section 2. The length of the entire project has been approx. 15 km. As a part of the final stage of the project, a 2,185 m long steel water main with Ø 1 000 mm shall be established during winter 2016/2017. Approximately half of the section is a new line, while one half shall be laid in the existing line where an old concrete pipe Ø 800 …
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As
2013-01-14County road 165 Hampenga - Buskerud border, new foot and cycle path (Statens vegvesen Region øst)
Construction of approx. 650 m foot and cycle path from Hampengen to the Buskerud border. The new foot and cycle path will be along most of the stretch laid on the existing county road. The new county road will be made on the filling towards the east. In the east there are bad ground conditions (sensitive and partly quick clay). Parts of the filling will consist of light filling matter (lightweight aggregates).
The new county road will go through an approx. 80 m long stretch where there is eternite waste …
Vis anskaffelsen » Nevnte leverandører:Arne Olav Lund As