2023-12-22Support in the operation and maintenance of Eelume robot vehicles. (NTNU)
Support services for Eelume ROV. The content of the framework agreement includes hours for participation in field operations with the robot, repairs, maintenance and spare parts. All of these services are not planned with the normal frequency, but on request.
Vis anskaffelsen »
2023-06-29Laboratory service for ROV and AUV (NTNU)
NTNU-AUR-Lab assignment is to carry out field operations with underwater robots and surface robots for research and teaching, both for internal and external users. This can mean operations outside normal working hours, and the tenderer must reckon on some work that must be done in the evenings and sometimes at weekends. This includes operations, maintenance, data processing, and minor development projects. These are mainly solved by the permanent staff in the laboratory. However occasionally there are …
Vis anskaffelsen » Nevnte leverandører:Staven R&D AS
2013-08-07Inspection of keel on the ship wreck of U-864 (Kystverket)
The Norwegian Coastal Administration, henceforth referred to as the Awarding Authority, shall implement detailed assessment of two environmental measures for further management of mercury pollution from the submarine U-864 wreck. The objective of the procurement is to obtain information of the condition of the mercury containers stored in the submarine's keel. The inspection of the keel applies only for the rear section of the wreck.
NOTE: To register your interest in this notice and obtain any …
Vis anskaffelsen » Nevnte leverandører:Dof Subsea Norway As
2013-07-03E39 Rogfast, directional core drilling from a drilling ship (Statens vegvesen Region vest)
E39 Rogfast is a subsea road tunnel between Randaberg and Bokn, with an arm up to Kvitsøy in Rogaland. Seismic surveys(in the sea and on land) and directional core drilling from land have previously been carried out. Directional core drilling shall now be carried out from a drilling ship in an area of the tunnel route where there is no rock exposure above sea level. Four holes shall be drilled through registered zones of week rock in the area. Cores (diameter approx. 55 mm) of the rock shall be brought …
Vis anskaffelsen »