2022-06-22   Active aired and closed composting system with the accompanying equipment (Veas Marked AS)
VEAS plans to construct a composting facility in Indre Østfold Municipality. This procurement includes process equipment, as well as equipment for transporting raw materials and compost, i.e: System/equipment for active aired and closed composting of sewage sludge/bio-remains and structure material, with the accompanying equipment for internal reception, mixing, feeding, and output. Vis anskaffelsen »
2014-07-28   Pre-qualification New Material Recovery and Anaerobic Digestion Facility - Kretsløp Follo (Follo Ren IKS)
Establishment of a new material recovery and anaerobic digestion facility with an annual capacity of 30.000 tonnes per year of municipal household waste in Vestby, Norway. The material recovery facility has to separate organic household waste, plastic and metals for recovery and residual waste for incineration. The anaerobic digestion facility has to produce biogas and compost from the organic household waste fraction. The biogas shall be upgraded to natural gas quality. The facility will form part of … Vis anskaffelsen »