Bygge- og anleggsarbeid i forbindelse med kompostanlegg⬅️
Nyeste anskaffelser av bygge- og anleggsarbeid i forbindelse med kompostanlegg i Norge
2023-12-12BUILDINGS AND INFRASTRUCTURE FOR THE BIOGAS FACILITY AT VOSS (BIR AS)
BIR AS shall establish a new biogas facility at Bjørkemoen in Voss. This turnkey contract includes construction and infrastructure for a biogas facility. The process part of the plant has been awarded to Biovoima Oy after a competition carried out in accordance with the regulations for the Public Procurement Regulations. The turnkey contractor for building and infrastructure will have the coordination responsibility for the turnkey contract signed with Biovoima Oy. A more detailed description of this is …
Vis anskaffelsen »
2022-06-22Active aired and closed composting system with the accompanying equipment (Veas Marked AS)
VEAS plans to construct a composting facility in Indre Østfold Municipality.
This procurement includes process equipment, as well as equipment for transporting raw materials and compost, i.e:
System/equipment for active aired and closed composting of sewage sludge/bio-remains and structure material, with the accompanying equipment for internal reception, mixing, feeding, and output.
Vis anskaffelsen »
2014-07-28Pre-qualification New Material Recovery and Anaerobic Digestion Facility - Kretsløp Follo (Follo Ren IKS)
Establishment of a new material recovery and anaerobic digestion facility with an annual capacity of 30.000 tonnes per year of municipal household waste in Vestby, Norway. The material recovery facility has to separate organic household waste, plastic and metals for recovery and residual waste for incineration. The anaerobic digestion facility has to produce biogas and compost from the organic household waste fraction. The biogas shall be upgraded to natural gas quality. The facility will form part of …
Vis anskaffelsen »