2011-10-03Haukland power station - 1 x Francis unit complete (Dalane Kraft AS)
1 x horizontal Francis unit shall be supplied. The new unit shall be placed in a new, separate station in the immediate vicinity of the existing power station. Complete electro-mechanical package;
1 x Francis turbine, maximum operating flow (Qmax) 2,2 m3/s, net head (He) 246 m, rotational speed (n) 1 000 rpm;
1 x generator, output approx. 5,5 MVA (cos phi = 0,9), voltage 6,6 kV;
Control equipment;
1 x transformer, approx. 6,0 MVA, 6,6/15,0/22,0 kV;
Main stop valve;
Expected average production approx. 20 โฆ
Vis anskaffelsen ยป
2011-09-30Haukland power station - new feed pipe to a new power station (Dalane Kraft AS)
A new feed pipe shall be delivered for a new power station, which shall replace the existing power station with 2 feed pipes along the same route.
Total length approx. 1 110 m.
Dimension DN 1000-DN1200. The final dimension will be chosen before the tender enquiry is sent out.
Maximum static pressure approx. 255m.
The existing self-closing valves will be kept. The new pipe is to be connected to the downstreamโs self-closing valves via a new Y-pipe.
GRP pipe shall be used in the upper part, ductile cast โฆ
Vis anskaffelsen ยป