Anskaffelser: International Centre for Hydropower
รn arkivert anskaffelse
International Centre for Hydropower har historisk anskaffet tjenester i forbindelse med trening og utdannelse, utdannelsestilbud og miljรธutdannelse.
Nyeste anskaffelser av International Centre for Hydropower
2017-09-11
Consultancy on Valuation Methods for environmental damage/impact: biodiversity and water-soil pollution/contamination (International Centre for Hydropower)
Scope of Services โ The Consultancy is divided into 2 phases: Phase A โ Tasks are to be addressed with respect to the development of various outputs namely: (i) Outline of ELD requirements for valuation (2 pages), and (ii) Practical guidelines on methods for assessing and valuation of environmental damage. A range of types of damage, change and loss must be considered โ the coverage will be directed by the GoG and LIC. Biodiversity (vegetation, wildlife and fish) and water quality will be core foci. โฆ Vis anskaffelsen ยป
Scope of Services โ The Consultancy is divided into 2 phases: Phase A โ Tasks are to be addressed with respect to the development of various outputs namely: (i) Outline of ELD requirements for valuation (2 pages), and (ii) Practical guidelines on methods for assessing and valuation of environmental damage. A range of types of damage, change and loss must be considered โ the coverage will be directed by the GoG and LIC. Biodiversity (vegetation, wildlife and fish) and water quality will be core foci. โฆ Vis anskaffelsen ยป