Prequalification Approach to Mo i Rana

Kystverket

"Approach Mo i Rana" is a collaborative project wherein several sub-projects will be carried out in Mo i Rana. The project owner and contracting parties are the Norwegian Coastal Administration and Rana Municipality, and the collaboration is regulated by a formal collaboration agreement between the organisations.
The project includes dredging and construction of a new deep water quay at Langneset, west of the Rana industrial terminal and dredging at the Toranester terminal.
The purpose of the project is to reduce the risk of ship accidents, increase the capacity of the harbour infrastructure and improve accessibility for ship traffic that comes to call at the terminals in Mo i Rana.
The project can be summarised as follows:
- Establishment of a landfill site
- Dredging of Toranes and Langneset
- Establishment of new quay and back areas at Langneset
Click https://permalink.mercell.com/206225945.aspx

Frist

Fristen for mottak av tilbud var 2023-08-28. Anskaffelsen ble publisert 2023-07-17.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2023-07-17 Kunngjøring av konkurranse
Kunngjøring av konkurranse (2023-07-17)
Gjenstand
Anskaffelsens omfang
Tittel: Dredging and pumping works
Referansenummer: 2021/7939
Kort beskrivelse:
"Approach Mo i Rana" is a collaborative project wherein several sub-projects will be carried out in Mo i Rana. The project owner and contracting parties are the Norwegian Coastal Administration and Rana Municipality, and the collaboration is regulated by a formal collaboration agreement between the organisations. The project includes dredging and construction of a new deep water quay at Langneset, west of the Rana industrial terminal and dredging at the Toranester terminal. The purpose of the project is to reduce the risk of ship accidents, increase the capacity of the harbour infrastructure and improve accessibility for ship traffic that comes to call at the terminals in Mo i Rana. The project can be summarised as follows: - Establishment of a landfill site - Dredging of Toranes and Langneset - Establishment of new quay and back areas at Langneset Click https://permalink.mercell.com/206225945.aspx
Vis mer
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Oppmudring og pumpearbeid 📦
Tilleggs-CPV: Anleggsarbeid i forbindelse med Kai 📦
Utførelsessted
NUTS-region: Nordland 🏙️

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Nasjonalt eller føderalt byrå/kontor
Navn på tildelende myndighet: Kystverket
Postadresse: Postboks 1502
Postnummer: 6025
Poststed: Ålesund
Kontakt
Internettadresse: https://permalink.mercell.com/206225945.aspx 🌏
E-post: hallvard.svendsen@kystverket.no 📧
Telefon: +47 07847 📞
URL for dokumenter: https://permalink.mercell.com/206225945.aspx 🌏
URL for deltakelse: https://permalink.mercell.com/206225945.aspx 🌏

Referanse
Datoer
Sendt dato: 2023-07-17 📅
Innleveringsfrist: 2023-08-28 📅
Publiseringsdato: 2023-07-21 📅
Startdato: 2023-12-11 📅
Sluttdato: 2026-07-01 📅
Identifikatorer
Kunngjøringsnummer: 2023/S 139-440543
OJ-S-utgave: 139

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
"Approach Mo i Rana" is a collaborative project wherein several sub-projects will be carried out in Mo i Rana. The project owner and contracting parties are the Norwegian Coastal Administration and Rana Municipality, and the collaboration is regulated by a formal collaboration agreement between the organisations.
Vis mer
The project includes dredging and construction of a new deep water quay at Langneset, west of the Rana industrial terminal and dredging at the Toranester terminal.
The purpose of the project is to reduce the risk of ship accidents, increase the capacity of the harbour infrastructure and improve accessibility for ship traffic that comes to call at the terminals in Mo i Rana.
The project can be summarised as follows:
- Establishment of a landfill site
- Dredging of Toranes and Langneset
- Establishment of new quay and back areas at Langneset
Establishment of a landfill for contaminated soil at Langneset.
During the project, a landfill will be built to handle contaminated soil and to establish a back area for the new quay. The landfill must have the capacity to handle all contaminated materials from the dredging.
The landfill will be constructed with two stone embankments (sea walls) from land out to sea. A straight sheet piling wall will be established at the front. The sheet piling must be protected against corrosion.
To improve the geotechnical conditions, two significant measures must be taken:
- Local soil in the area must be drained by establishing vertical drainage.
- Contaminated soil deposited at the landfill must be stabilised. This is done by adding a binding agent (e.g. lime, cement, slag, etc.) to the contaminated soil.
Dredging (deepening) at the Toranester terminal
- Planned depth 8.3 m (ref. nautical chart zero) inner part
- Planned depth 11.3 m (ref. nautical chart zero) outer part
- approx. 11,5000 m3 of contaminated soil
- approx. 30,000 m3 of clean soil
- Contaminated sediments will be deposited in a new landfill at Langneset.
- Clean sediments will be deposited in the sea at an approved seabed disposal site in Ranfjorden.
- Dredging slopes must be protected against erosion.
Dredging (deepening) at Langneset
- Planned depth -15.3 m (ref. nautical chart zero)
- approx. 10,500 m3 of contaminated soil
- approx. 60,000 m3 of clean soil
Establishment of a new pile quay with associated back areas at Lagneset
After the contaminated soil is deposited, the landfill area will be finalised to be used as a back area for the quay. This is done by filling the area with blasted stone and finishing with an asphalt surface.
A conventional pile quay with a concrete cover will also be established in front of the landfill/back areas.
In addition to this, the entire area will be prepared for completion so that the area is ready for use after the project is finalised.
Utførelsessted
Hovedsted eller utførelsessted: Mo i Rana

Prosedyre
Rettslig grunnlag: 32014L0024
Minste antall kandidater: 3
Største antall kandidater: 5
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 6 måneder

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 874783242
Kontakt
Kontaktpunkt: Hallvard Svendsen
Adresse til kjøperprofilen: http://www.kystverket.no/ 🌏
URL for dokumenter: https://permalink.mercell.com/206225945.aspx 🌏

Utfyllende informasjon
Klageinstans
Navn: Lofoten tingrett
Poststed: Svolvær
Postnummer: 8300
Land: Norge 🇳🇴
Kilde: OJS 2023/S 139-440543 (2023-07-17)