The main road from Røyrasundet to Svædet in Herøy and Ulstein municipalities shall be elaborated. The main aim is to increase security and ease of navigation in a complex and weather prone fairway. The measure comprises a total of 3 deepening areas Skinnbrokleia, Kyrkjefluda and Svædet. It is planned to dredge all areas to a depth of -11.3 metres (nautical chart wool). The total planned deepening area is approx. 86,000 m² and the calculated deepening volume is approx. 175,000 cubic metres of engineered solid matter (pfm³). The project has two regulated and approved seabed deposits, one in direct connection to the deepening area at Skinnbrokleia and one at Kyrkjefluda. The project has an option to transport the deepening masses to Herøy municipality ́s filling area Paradisbukta.
Kunngjøring av konkurranse (2026-03-13) Gjenstand Anskaffelsens omfang
Tittel: Passing through Herøy - Ulstein
Referansenummer: 2026/1130
Kort beskrivelse:
“The main road from Røyrasundet to Svædet in Herøy and Ulstein municipalities shall be elaborated. The main aim is to increase security and ease of...”
Kort beskrivelse
The main road from Røyrasundet to Svædet in Herøy and Ulstein municipalities shall be elaborated. The main aim is to increase security and ease of navigation in a complex and weather prone fairway. The measure comprises a total of 3 deepening areas Skinnbrokleia, Kyrkjefluda and Svædet. It is planned to dredge all areas to a depth of -11.3 metres (nautical chart wool). The total planned deepening area is approx. 86,000 m² and the calculated deepening volume is approx. 175,000 cubic metres of engineered solid matter (pfm³). The project has two regulated and approved seabed deposits, one in direct connection to the deepening area at Skinnbrokleia and one at Kyrkjefluda. The project has an option to transport the deepening masses to Herøy municipality ́s filling area Paradisbukta.
Vis mer
Kontrakttype: Bygge- og anleggsarbeid
Produkter/tjenester: Anleggsarbeid til havs📦 Beskrivelse
Beskrivelse av anskaffelsen:
“The main road from Røyrasundet to Svædet in Herøy and Ulstein municipalities shall be elaborated. The main aim is to increase security and ease of...”
Beskrivelse av anskaffelsen
The main road from Røyrasundet to Svædet in Herøy and Ulstein municipalities shall be elaborated. The main aim is to increase security and ease of navigation in a complex and weather prone fairway. The measure comprises a total of 3 deepening areas Skinnbrokleia, Kyrkjefluda and Svædet. It is planned to dredge all areas to a depth of -11.3 metres (nautical chart wool). The total planned deepening area is approx. 86,000 m² and the calculated deepening volume is approx. 175,000 cubic metres of engineered solid matter (pfm³). The project has two regulated and approved seabed deposits, one in direct connection to the deepening area at Skinnbrokleia and one at Kyrkjefluda. The project has an option to transport the deepening masses to Herøy municipality ́s filling area Paradisbukta.
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2026-05-11 10:00:00 📅
Vilkår for åpning av tilbud: 2026-05-11 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 3
Utfyllende informasjon Klageinstans
Navn: Salten og Lofoten tingrett
Nasjonalt registreringsnummer: 826 723 122
Postadresse: Storgata 38, 8006 Bodø, Norge
Postnummer: 8006
Poststed: Bodø
Region: Møre og Romsdal🏙️
Land: Norge 🇳🇴 Klageprosedyre
Presis informasjon om frister for klageprosedyrer:
“PPR part III (above the EEA threshold):
Waiting period: 10 days after the award of contract.
Appeals to the contracting authority: no fixed deadline,...”
Presis informasjon om frister for klageprosedyrer
PPR part III (above the EEA threshold):
Waiting period: 10 days after the award of contract.
Appeals to the contracting authority: no fixed deadline, ought to occur during the waiting period.
Temporary injunction: Must be petitioned before the contract is signed.
KOFA appeal: No fixed deadline.
Vis mer Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk betaling vil bli brukt
Kilde: OJS 2026/S 052-179376 (2026-03-13)