2019-12-23   The Establishment of a Fishing Fleet Harbour —Turnkey Contract (Gamvik-Nordkyn Havn KF)
The tender competition applies to a pier and deepening measures thereof. The pier measure is an expansion of the Ringskjær pier and includes the construction of a new pier with a length of approx. 180 metres. The deepening measure shall result in depth in front of the quays and a maneuvering area adapted to the requirements for the harbour. Gamvik Municipality is executing and prepaying the measure on behalf of the Norwegian Coastal Administration. The estimated value is 72 000 000 NOK excluding VAT. The … Vis anskaffelsen »
Nevnte leverandører: Secora As
2018-06-04   Seaward approach Bodø — Part II (Kystverket)
A wider seaward approach to Bodø and a deeper sailing depth are planned. This includes the deepening of three banks in the seaward approach to Bodø harbour as well as the dredging of a larger field inside Bodø harbour. Vis anskaffelsen »
2016-06-10   Grøtøy Route Passage — Deepening (Kystverket (The Norwegian Coastal Administration))
Deepening of the Grøtøy Straits fairway to -5.3 and -6.3 metres. Option on deepening of the entire Hartvikgrunnen to -5.3 metres. Vis anskaffelsen »
Nevnte leverandører: Wasa Dredging Ltd
2016-05-26   Bodø Port — Terminal Quay (Kystverket (The Norwegian Coastal Administration))
The contract involves the expansion of the existing terminal quay in Bodø. The quay shall be expanded to a width of 10m and a length of 349m. Dredging and continuous laying of support fillings shall be executed in front of the quay. The seabed outside the quay shall be deepened to contour line — 11,0 (c.f. chart datum level 0). Vis anskaffelsen »
2016-01-14   Approach Tromsø — Kvalsundet — deepening (Kystverket [the Norwegian Coastal Administration])
The deepening of 4 shoals in Kvalsundet. Option for the establishment of sub-filling for a encompass pier at Breivika in Tromsø. Vis anskaffelsen »
Nevnte leverandører: Fyllingen Sjø AS
2015-04-24   Napp harbour (Kystverket Nordland)
Kystverket is the builder in the project which involves the development of Napp harbour. Napp harbour shall be developed with a new pier and deepening of the harbour to – 6,3 in the inner harbour and – 7,3 in the outer harbour. An environmental disposal site for contaminated masses shall also be established. Vis anskaffelsen »
Nevnte leverandører: Per Aarsleff AS
2015-03-03   Napp harbour (Kystverket Nordland)
Kystverket is the builder in the project which involves the development of Napp harbour. Napp harbour shall be developed with a new pier and deepening of the harbour to — 6,3 in the inner harbour and — 7,3 in the outer harbour. An environmental disposal site for contaminated masses shall also be established. Vis anskaffelsen »
Nevnte leverandører: Per Aarsleff AS
2013-06-24   Fish farm for Bahía de Cochinos on Cuba (Havforskningsinstituttet)
The Institute of Marine Research would like tenders for a turnkey fish farm (sea pen). The farm shall be installed in the chosen site in Bahia de Cochinos (the Bay of Pigs) on Cuba, ready for fish. See the tender documents for further information. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=298420 Vis anskaffelsen »