In 2017 the Norwegian Environment Agency instructed Avinor to clear PFOS polluted ground at Harstad/Narvik Airport Evenes through the establishment of a water treatment facility for treating run-off from the former fire training area (BØF) to the west of the runway.
The scope of various measures were considered as regards site implementation and waste management, as well as the costs of implementing the measures. Avinor decided to carry out the most comprehensive alternative, in which all known PFOS pollution is removed through the measure.
Frist
Fristen for mottak av tilbud var 2020-10-07.
Anskaffelsen ble publisert 2020-09-03.
Kunngjøring av konkurranse (2020-09-03) Gjenstand Anskaffelsens omfang
Tittel: Excavating and earthmoving work
Referansenummer: 20/04201
Kort beskrivelse:
“In 2017 the Norwegian Environment Agency instructed Avinor to clear PFOS polluted ground at Harstad/Narvik Airport Evenes through the establishment of a...”
Kort beskrivelse
In 2017 the Norwegian Environment Agency instructed Avinor to clear PFOS polluted ground at Harstad/Narvik Airport Evenes through the establishment of a water treatment facility for treating run-off from the former fire training area (BØF) to the west of the runway.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Utgravning og fjerning av jord📦
Tilleggs-CPV: Rensing av jordsmonn📦 Utførelsessted
NUTS-region: Nord-Norge🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet