Kort beskrivelse
The contract consists of the development of a new roundabout with a diameter of 50 m on the current county road 282 Strandveien, as well as 2 short arms to the side. The roundabout will have the same look as the existing roundabout in Strandveien. The contract also includes moving the existing foot/cycle path on the sea side, as well as demolishing and establishing a new surface water system and lighting.