Antall eller omfang
1. Surface treatment of steel: Hanging cables approximately 2 000 m,2. Surface treatment of steel: Various steel constructions: Approximately 3 500 m2,3. Surface treatment of steel: Arch truss: Approximately 10 000 m2 — Option for cancellation,4. Maintenance of the existing railings including street light masts: Approximately 1 750 m,5. Replacement of the existing railings including street light masts: Approximately 1 750 m — option for cancellation,6. New climbing screens: Approximately 1 750 m,7. New middle railings: Approximately 1 750 m,8. New noise reduction screen: Approximately 120 + 130 m,9. New portal beam (steel): Approximately 8.7 t,10. Concrete repairs (pillars, walls, bridge cover, etc.) Approximately 55 000 l,11. Surface treatment of concrete: Approximately 17 000 m2,12. Removal of pavement and establishment of a 1-sided foot/cycle path: Approximately 2 300 m2,13. Reinforcement with carbon fibre: Approximately 100 m (beam) + 400 m2 (pillars),14. Milling asphalt approximately 1 000 t,15. New asphalt wearing course Ska 11: Approximately 825 t,16. Miscellaneous: electrowork, including 1 distribution, 100 ditch with cable, 2 000 m cable for street lights, 2 000 m earth wire, 14 000 m conduits, 12 conduit manholes, 37 street light masts including fittings, 2 sailing lights with fixings,17. Effect lighting — option for cancellation.