2016-02-29D006 Air treatment system and D007 Automation (Kultur- og idrettsbygg (Culture and Sports Facilities))
The purpose of this procurement is to enter into a contract with a contractor to execute the contract
‘D006 Air treatment system and D007 Automation’.
The building consists of five main floors and three mezzanines above ground in addition to a basement floor (U1) with a mezzanine/gallery (U1G). Through the contract ‘D006 Air treatment system and D007 Automation’ the contracting authority shall procure:
— Air treatment system.
— Pressurization emergency escape stairs.
— Building management system.
— …
Vis anskaffelsen » Nevnte leverandører:GK Inneklima