2020-05-19Ørland Flystasjon [Ørland Air Base] Renewal of TWY Yankee and A4-A7 Electrical Works (Forsvarsbygg)
TWY Yankee, the taxiway parallel to the runway will be renovated and upgraded so that it satisfies formal NATO requirements such as emergency runway for RFJ (Tactical Jager planes) and TTA (Tactical Transport Planes), as well as formal taxiway requirements in accordance with NATO requirements and EASA requirements (civil).
This procurement includes the electrical works.
Click here https://permalink.mercell.com/130091997.aspx
Vis anskaffelsen »
2020-05-12Ørland — 100370 — C01884 — Renewal of TWY Yankee and A4-A7 (The Norwegian Defence Estates Agency)
The Norwegian Defence Estates Agency invites tenderers to submit an application to participate in a competition with negotiations for project 100370 Renewal of TWY Yankee and A4-A7, at the parallel Air Base.
TWY Yankee, the taxiway parallel to the runway will be renovated and upgraded so that it satisfies formal NATO requirements such as emergency runway for RFJ (Tactical Jager planes) and TTA (Tactical Transport Planes), as well as formal taxiway requirements in accordance with NATO requirements and …
Vis anskaffelsen »
2018-09-18187934 — Oslo Airport — Re-asphalting Work for 'Østre Runway Electrical Contract' (Avinor AS)
Avinor AS Oslo Airport will re-asphalt the eastern runway in 2019.
In addition to the re-asphalting, approach 19L must be upgraded to CATII/III so that it can be used under low visibility conditions.
The electrical contract for this work will, at times, be an intense contract with disconnections and disassembly of runway lights, drilling out old pots, as well as the assembly of new pots and fixtures and connecting them. Auxiliary work for new LLZ aerials will be an option.
Vis anskaffelsen »
2018-01-22187235 - Procurement of lightning protection on towers (Avinor AS)
During the next few years, Avinor AS shall improve the lightning protection installations on several of Avinor’s tower buildings. Based on the condition of the existing lightning protection systems, whether the parts of the installation need to be improved, or if a complete new lightning protection system is required will vary.
Vis anskaffelsen »
2013-08-08P-182675 Taxiways Tango and Bravo 2 – Electrical work (Oslo Lufthavn AS)
OSL will extend taxiway Tango from taxiway B4 to new taxiway B2. In addition a running curve will be established from taxiway B8 north to taxiway Sierra. Taxiway B2 will be built simultaneously with the extension of Tango. This contract includes the necessary electrical work, which will largely consist of runway lighting work, but other electrical installations may be involved. The runway lighting work will include the establishment of taxiway lighting, lead on, lead off, stopping points and signs. …
Vis anskaffelsen »
2012-10-23P-181887 Taxiways Tango and Bravo 2 - Electro works (Oslo Lufthavn AS)
OSL shall extend taxiway Tango from taxiway B4 to a new taxiway B2. Taxiway B2 shall be constructed at the same time as the extension of Tango. This contract is for the necessary electro works that will most consist of taxiway lights work but other electro installations can occur. The taxiway lights will consist of the establishment of taxiway lights, lead on, lead off, stop bar and signs. Transformers and control units for the taxiway lights will be established in separate manholes and the cables will …
Vis anskaffelsen »
2011-10-31Runway lights Bergen Airport, Flesland - Central de-icing platform (Avinor AS)
In connection with the establishment of a central de-icing platform at Bergen Airport Flesland, the following shall be delivered and assembled: Earthing installations, flush light fittings with LES light sources, lamp transformers, signs with LED light sources, primary and secondary cables.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=242685.