2026-11-05   Deadline 2026-12-11   2027 Framework agreement Emergency excavation preparedness water and sewage. (Trondheim Kommune)
The framework agreement includes excavation stand-by for acute, planned and planned excavation and water and sewage work managed by Trondheim municipality. The assignments mainly involve repairs to the existing infrastructure as a result of unwanted events such as, for example: water leaks, clogging or collapse of surface water and/or sewage pipelines, replacement of water and sewage manholes in addition to general maintenance of the water and sewage infrastructure. This also results in a return of the … Vis anskaffelsen »
2025-01-14   2025 Framework agreement for excavating preparedness water and sewage (Trondheim Kommune)
Trondheim city operations needs a framework agreement for excavation preparedness water and sewage. Most assignments in connection with repairs and replacements of water pipelines. Vis anskaffelsen »