2020-06-12   Emergency Water Equipment (Nedre Romerike Vannverk IKS)
The emergency water work in the Oslo area has a need for more equipment. There is a need for equipment that can cover new members in the collaboration, and equipment that can improve logistic challenges during an emergency water situation. Vis anskaffelsen »
Nevnte leverandører: KZ Handels as Scandinavian Water Technology AS
2016-01-05   Equipment for the transportation and distribution of emergency water (Glitrevannverket IKS)
The aim of the procurement is to increase the security of supplies in the event of major stand-by situations in which the delivery of clean drinking water is seen as critical. The emergency water equipment shall be placed in 2 stand-by storages. Vis anskaffelsen »
2014-04-01   Equipment for the transportation and distribution of emergency water (Glåmdal Interkommunale vann- og avløpsselskap (GIVAS IKS))
Elverum municipality, HIAS IKS and GIVAS IKS are cooperating for the procurement of equipment for the transportation and distribution of emergency water. The aim of the procurement is to increase the security of supplies in the event of major stand-by situations in which the delivery of clean drinking water is seen as critical. The emergency water equipment shall be stationed in joint stand-by stores. This notice includes the following three separate enquiries: 1. 2 adapted 20 foot Container for storing … Vis anskaffelsen »
2013-02-14   WS Sjusjøen-Moelv, Enterprise 12-1, Næroset elevated reservoir (Ringsaker kommune, Teknisk drift)
The establishment of a new elevated reservoir for drinking water in Næroset, with a total volume of 500 cubic meters. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=283296 Vis anskaffelsen »
Nevnte leverandører: M. Grønvold AS
2013-01-28   Hundvåg and Kvernevik swimming pool - water treatment (Stavanger kommune)
Two swimming pools shall be constructed. Hundvåg swimming pool has a total of 2937 m2 and Kvernevik swimming pool has a total of 3060 m2. The difference in the size is due to Kvernevik swimming pool having a larger basement area due to access conditions, whilst the area is in the actual swimming pool and changing rooms is the same in both places. The choice of materials and the technical installations will be the same in both places. The swimming pools are almost identical, Kvernevik swimming pool is a … Vis anskaffelsen »