2014-07-01Module/container based surgeries (OP theatres), UNN Tromsรธ (Universitetssykehuset Nord-Norge HF)
The University Hospital UNN Tromsรธ will start reconstruction and new construction of the A-wing in autumn 2015. In this regard there is a need to substitute parts of the operating activity out in the temporary building to ensure the hospitals operation during the building period. 4 surgeries will be planned and delivered ready for operation 1.3.2014. The total operational time shall continue throughout 2018. Thereafter the modules/containers shall be relocated.
Short description of the prerequisites: