2024-12-20   Procurement of Indies Atlas-II Turbine and Engine Control Platform Units (Forsvarsmateriell)
The scope of the procurement is limited to the purchase and delivery of seven (7) original and unused Minibus Atlas-II Turbine and Engine Control Platforms with the configuration of 8273-571. Vis anskaffelsen ยป
2019-03-28   The Procurement of Micro-Gas Turbines for Fuglevik Treatment Plant (MOVAR IKS)
Micro-gas turbines shall be installed and commissioned at Fuglevik Treatment plant. The micro-gas turbines shall use bio-gas produced at the Treatment plant as engine fuel. The contractor is responsible for including all the required equipment for an operational and well-functioning plant. Vis anskaffelsen ยป
Nevnte leverandรธrer: Adigo AS
2014-06-21   Service contract(s) for turbines (Oslo kommune, Energigjennvinningsetaten)
The Norwegian Waste to Energy Agency needs to enter into service contracts for respectively MAN MARC 2 turbine and Siemens V25 turbine. The service contract(s) will include support, annual inspection, minor/major overhaul and repairs, as well as the supply of spare parts. Vis anskaffelsen ยป