Anskaffelser: Tromsø Kommune — vann og avløp

4 arkiverte anskaffelser

Tromsø Kommune — vann og avløp har historisk anskaffet industrimaskiner, maskiner til produksjon og utnyttelse av mekanisk energi og pumper og kompressorer.

Nyeste anskaffelser av Tromsø Kommune — vann og avløp

2020-10-14   902410 Kvaløya Pump Stations, Contract 1: Delivery of Prefabricated PS (Tromsø Kommune — vann og avløp)
The contract includes the delivery and commissioning of four prefabricated sewage pump stations with prefabricated superstructures. The contract also includes activation and commissioning period in accordance with the water and sewage standard service contract and service contract for delivered pump stations. This contract was first announced in September 2020 but due to technical errors with the extension of the deadline it had to be cancelled and now announced again. The deadline was due to be extended … Vis anskaffelsen »
2020-09-11   902410 Kvaløya Pump Stations, Contract 1: Delivery of Pre-fabricated PS (Tromsø Kommune — vann og avløp)
The contract includes the delivery and activation of three pre-fabricated sewage pump stations and one built in-situ. Four prefabricated superstructures are included. The contract also includes activation and commissioning period in accordance with the Water and Sewage standard service contract and service contract for delivered pump stations. Vis anskaffelsen »
2019-12-05   900702 — 900703 — 900704 Mortensnes Lot 3, Lot 4 and Lot 5; Detailed Engineering Design (Tromsø Kommune — vann og avløp)
The assignment includes detailed engineering design for the infrastructure (road, water, sewage, storm water, park and green areas) for Mortensnes district. Vis anskaffelsen »
Nevnte leverandører: Sweco Norge AS (Hovedenhet)
2017-04-11   Engineering design services P900701 Mortensnes parts 2-5, detail work (second notice) (Tromsø Kommune — vann og avløp)
Mortensnes project consists of 5 different parts. This assignment is for detailed engineering design work for parts 2-5. The assignment shall be designed as two different tender competitions. Part 2 will be one tender and parts 3-5 will be the second. The engineering design basis from parts 3-5 shall be included in a collaboration contract. In addition an overview map must be prepared for the entire area, showing route choices for pipeline and water routes, as well as the chosen dimensions. Vis anskaffelsen »