Anskaffelser: Petroleumstilsynet [Petroleum Safety Authority Norway]
2 arkiverte anskaffelser
Petroleumstilsynet [Petroleum Safety Authority Norway] har historisk anskaffet møbler (inkludert kontor møbler), inventar, husholdningsmaskiner, (utenom belysning) og rengjøringsmidler, husholdningsapparater og elektriske husholdningsapparater.
Historisk har leverandører til Petroleumstilsynet [Petroleum Safety Authority Norway] vært DNV GL og Jacobs Douwe Egberts Norge AS.
Nyeste anskaffelser av Petroleumstilsynet [Petroleum Safety Authority Norway]
2016-02-18
16/242 — The hire of coffee makers and the delivery of coffee related products (Petroleumstilsynet [Petroleum Safety Authority Norway])
The hire of 8 coffee makers, service and follow-up as well as the delivery of coffee related products. The agreement period is 1 year with option for 1 year + 1 year + 1 year prolongation of the contract. The Contracting Authority uses Mercell Sourcing Service. To express your interest and gain access to any documents, please click on the link below or copy and paste the link into your browser. (http://permalink.mercell.com/56573699.aspx). Then follow the instructions on the website. Vis anskaffelsen »
The hire of 8 coffee makers, service and follow-up as well as the delivery of coffee related products. The agreement period is 1 year with option for 1 year + 1 year + 1 year prolongation of the contract. The Contracting Authority uses Mercell Sourcing Service. To express your interest and gain access to any documents, please click on the link below or copy and paste the link into your browser. (http://permalink.mercell.com/56573699.aspx). Then follow the instructions on the website. Vis anskaffelsen »
2016-02-12
15/1018 Construction safety in arctic areas (ST5) (Petroleumstilsynet [Petroleum Safety Authority Norway])
As there will be more activity in the northern areas, there is a need to look at the different installations' suitability, challenges and risks, as well as the accompanying risk reducing measures connected to structural integrity. The Petroleum Safety Authority Norway will initiate a project where the object is to study these conditions in more details. The project will have a total duration from May 2016 to the end of 2017 (including the option) and it will be carried out in 2 phases: Phase 1 … Vis anskaffelsen »
As there will be more activity in the northern areas, there is a need to look at the different installations' suitability, challenges and risks, as well as the accompanying risk reducing measures connected to structural integrity. The Petroleum Safety Authority Norway will initiate a project where the object is to study these conditions in more details. The project will have a total duration from May 2016 to the end of 2017 (including the option) and it will be carried out in 2 phases: Phase 1 … Vis anskaffelsen »