2017-01-20Skjeftejordet shared housing construction stage 2 (Espen Aursand Arkitektkontor AS)
Steinkjer municipality c/o Steinkjerbygg KF invites contractors with documented qualifications and capacity to an open tender contest for the construction of Skjeftejordet shared housing construction stage 2.
Construction stage 2 consists of a total of 32 flats plus communal areas.
Vis anskaffelsen ยป
2015-11-12Ytteren primary school โ Book 1 โ Structural works (Espen Aursand Arkitektkontor AS)
Book 1 โ Structural main contract:
โ E01 Rigging and operations;
โ E02 Demolition commons 6;
โ E04 Structural auxiliary works;
โ E05 Hardware description;
โ E10 Grounds, concrete, steel, masonry and load-bearing timber structures;
โ E20 Joinery, smith, glass, painting and ceiling works;
โ E70 Gardiner works.
Vis anskaffelsen ยป
2014-06-04Selfors Nursing Home, Mo i Rana, Norway (Espen Aursand Arkitektkontor AS)
Construction of a new nursing home with capacity of 80. dwelling units for elderly. The building is divided in 4 sections with dwelling units, an administration area and a personnel area, as well as an entire floor with offices for the home care service Total area 9 987,7 mยฒ divided between a total of 5 levels. The surrounding terrain shall be developed with construction of a sense garden and parking lots.
Vis anskaffelsen ยป