2021-12-07Procurement of lifting mechanics - pulleys (Det Vestnorske Teateret AS)
The West Norwegian Theatre is being renovated with reopening scheduled for autumn 2022. The main hall will be upgraded in the renovation, with lifting devices for coverings and technical equipment. The mechanics/infrastructure is to be assembled in an established grid above the existing stage area and in the loft above the hall ceiling.
Vis anskaffelsen »