The contracting authority would like to enter into a contract with a tenderer for consultancy services for the subsequent operation of Rådalen waste disposal site. The contract is for monitoring and consulting connected to the after-operations of Rådalen waste disposal site. The scope includes assignments given in an environment monitoring programme and the execution of other environmental reports connected to post-operation.
Frist
Fristen for mottak av tilbud var 2024-05-21.
Anskaffelsen ble publisert 2024-04-15.
Kunngjøring av konkurranse (2024-04-15) Gjenstand Anskaffelsens omfang
Tittel: BME EØS 2024-01 Miljøovervåking Rådalen
Referansenummer: 2024/58727
Kort beskrivelse:
“The contracting authority would like to enter into a contract with a tenderer for consultancy services for the subsequent operation of Rådalen waste...”
Kort beskrivelse
The contracting authority would like to enter into a contract with a tenderer for consultancy services for the subsequent operation of Rådalen waste disposal site. The contract is for monitoring and consulting connected to the after-operations of Rådalen waste disposal site. The scope includes assignments given in an environment monitoring programme and the execution of other environmental reports connected to post-operation.
Vis mer
Kontrakttype: Tjenester
Produkter/tjenester: Miljøovervåking, bortsett fra bygge- og anleggsarbeid📦
Estimert verdi eksklusive mva: 9 800 000 NOK 💰
Beskrivelse
Beskrivelse av anskaffelsen:
“The contracting authority would like to enter into a contract with a tenderer for consultancy services for the subsequent operation of Rådalen waste...”
Beskrivelse av anskaffelsen
The contracting authority would like to enter into a contract with a tenderer for consultancy services for the subsequent operation of Rådalen waste disposal site. The contract is for monitoring and consulting connected to the after-operations of Rådalen waste disposal site. The scope includes assignments given in an environment monitoring programme and the execution of other environmental reports connected to post-operation.
Prosedyre Prosedyretype
Åpen anbudskonkurranse ✅ Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-05-21 10:00:00 📅
Vilkår for åpning av tilbud: 2024-05-21 10:00:00 📅
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Minste tidsramme som tilbyderen må opprettholde tilbudet i: 2
Informasjon om en rammeavtale eller en dynamisk innkjøpsordning
Rammeavtale med flere leverandører ✅
Juridisk, økonomisk, finansiell og teknisk informasjon Økonomisk og finansiell stilling
Liste og kort beskrivelse av utvelgelseskriterier:
“'Total' annual turnover: The tenderer ́s ("total") annual turnover for the number of financial years requested in the tender notice or in the procurement...”
Liste og kort beskrivelse av utvelgelseskriterier
'Total' annual turnover: The tenderer ́s ("total") annual turnover for the number of financial years requested in the tender notice or in the procurement documents is as follows:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Average annual turnover: The tenderer ́s average annual turnover for the number of years requested in the notice or in the procurement documents is as follows:”
Liste og kort beskrivelse av utvelgelseskriterier:
“"Specific annual turnover": Are the tenderer's ("specific") annual turnover within the area that the contract applies to and specified in the notice or in...”
Liste og kort beskrivelse av utvelgelseskriterier
"Specific annual turnover": Are the tenderer's ("specific") annual turnover within the area that the contract applies to and specified in the notice or in the procurement documents for the number of accounting years requested is as follows:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Average set-up: Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement...”
Liste og kort beskrivelse av utvelgelseskriterier
Average set-up: Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement documents for the number of financial years requested:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“The tenderer's establishment date: If the information about the turnover (combined or specific) is not available for the entire requested period, please...”
Liste og kort beskrivelse av utvelgelseskriterier
The tenderer's establishment date: If the information about the turnover (combined or specific) is not available for the entire requested period, please state the date the company was established, or the tenderers started their business:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Financial key figures: For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the...”
Liste og kort beskrivelse av utvelgelseskriterier
Financial key figures: For financial key figures stated in the notice or in the procurement documents, the tenderer declares that the actual value(s) of the requested key figures are as follows:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Liability insurance: The insured amount in the tenderer ́s liability insurance is the following:”
Liste og kort beskrivelse av utvelgelseskriterier:
“Other economic and financial requirements: Regarding any other economic and financial requirements that have been stated in the notice or in the procurement...”
Liste og kort beskrivelse av utvelgelseskriterier
Other economic and financial requirements: Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
Vis mer Vilkår for deltakelse
Liste og kort beskrivelse av regler og kriterier:
“Certificates issued by independent bodies for quality assurance standards.: Can tenderers submit certificates issued by independent bodies that document...”
Liste og kort beskrivelse av regler og kriterier
Certificates issued by independent bodies for quality assurance standards.: Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
Minimum qualification requirements
The contracting authority requires that all tenderers have implemented a quality management system that is satisfactory in order to ensure the quality of the execution of this contract. Documentation requirement: If the tenderer has a third-party certification such as ISO 9001, enclose the certificate with the tender. If a tenderer does not have such third-party certification, at least the following must be submitted: System name + general description of the contents of the system, including an overview of control plans and check-lists that are relevant for this contract + organisation chart showing the responsibilities in the quality management system + description of routines for internal control and handling deviations (work with corrective and preventive measures) + description of how the system will be used to ensure the quality of this contract. We would like the documentation to be put together to 1 pdf, called "Documentation of quality assurance".
Vis mer
Liste og kort beskrivelse av regler og kriterier:
“Certificates issued by independent bodies for environmental management standards.: Is the tenderer able to submit certificates issued by independent bodies...”
Liste og kort beskrivelse av regler og kriterier
Certificates issued by independent bodies for environmental management standards.: Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards?
Minimum qualification requirements
The contracting authority requires tenderers who have procedures and systems that ensure that the execution of the delivery has a low environmental impact. Documentation requirement: If the tenderer has a third-party certification in accordance with ISO 14001, Miljøfyrtårn, EMAS or similar, enclose a certificate with the tender. If the company does not have such a third-party certification, at least the following must be submitted: System name + general description of the contents of the system, including an overview of control plans and check-lists that are relevant for this contract + organisation chart showing the responsibilities in the environmental management system + description of procedures for internal control and handling of deviations + a description of how the system will be used to reduce the environmental impact of this contract. We would like the documentation to be put together to 1 pdf, called "Documentation environmental management".
Vis mer
Liste og kort beskrivelse av vilkår:
“Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described...”
Liste og kort beskrivelse av vilkår
Registered in a trade register: Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Vis mer
Liste og kort beskrivelse av vilkår:
“Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the...”
Liste og kort beskrivelse av vilkår
Registered in a trade register or company register.: Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
Minimum qualification requirements
Tenderers shall be a legally registered company.
Documentation: Documentation: Documentation must not be enclosed for tenderers registered in the Norwegian Register of Units. The contracting authority will check the registration by using the organisation number stated in the tenderer ́s Mercell profile.
Tenderers who are not registered in the above register must present a certificate or confirmation (equivalent company registration certificate) for registration in a trade or business register as prescribed by the law of the country where the tenderer is established. Such a certificate shall not be issued more than six months before the tender deadline.
Vis mer
Liste og kort beskrivelse av vilkår:
“In the case of service contracts: Authorisations from a particular organisation required: Is a specific authorisation required from a particular...”
Liste og kort beskrivelse av vilkår
In the case of service contracts: Authorisations from a particular organisation required: Is a specific authorisation required from a particular organisation to provide the service in the tenderer's home country?
Vis mer
Liste og kort beskrivelse av vilkår:
“In the case of service contracts: Membership in a particular organisation is required: Is it necessary to have a particular membership in a particular...”
Liste og kort beskrivelse av vilkår
In the case of service contracts: Membership in a particular organisation is required: Is it necessary to have a particular membership in a particular organisation in order to provide the service in the tenderer ́s home country?
Vis mer Teknisk og faglig kapasitet
Liste og kort beskrivelse av utvelgelseskriterier:
“Services only: Only for services: In the reference period, the tenderer has carried out the following important goods deliveries of the requested type, or...”
Liste og kort beskrivelse av utvelgelseskriterier
Services only: Only for services: In the reference period, the tenderer has carried out the following important goods deliveries of the requested type, or the following important services of the requested type. The contracting authority can require up to three years experience and allow experience from the previous three years to be taken into consideration.
Minimum qualification requirements
Tenderers shall have good and relevant experience with projects of equivalent complexity and scope. The experience shall as a minimum include one project from multi-year (minimum 24 months) environmental monitoring of an equivalent extent and at least one project with measurements of landfill gas emissions. Documentation requirement: Relevant experience shall be documented by stating a minimum of two and a maximum of five reference projects carried out in the last 5 years. It shall be clear how much of the reference projects include environmental monitoring and emissions of landfill gas. The references are to be added directly to Mercell as a response to this point. If more than five reference projects are given, only the first five will be assessed.
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for...”
Liste og kort beskrivelse av utvelgelseskriterier
Technical personnel or technical units: Tenderers can use the following technical personnel or technical units , particularly those who are responsible for quality control: For technical personnel or technical units that do not directly belong to the tenderer ́s business, but if the capacity the tenderer will use, cf. part II, section C, separate ESPD forms shall be supplemented.
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Technical facilities and quality assurance measures: The tenderer utilises the following technical facilities and quality assurance measures and the...”
Liste og kort beskrivelse av utvelgelseskriterier
Technical facilities and quality assurance measures: The tenderer utilises the following technical facilities and quality assurance measures and the tenderer ́s survey and research facility is as follows:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Investigation and research facilities: The tenderer ́s survey and research facilitates are as follows:”
Liste og kort beskrivelse av utvelgelseskriterier:
“Management and tracing of the supply chain: The tenderer will be able to use the following management of the supply chain and tracing systems for the...”
Liste og kort beskrivelse av utvelgelseskriterier
Management and tracing of the supply chain: The tenderer will be able to use the following management of the supply chain and tracing systems for the execution of the contract:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow...”
Liste og kort beskrivelse av utvelgelseskriterier
Control Permission: For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Education and professional qualifications: The following education and professional qualifications are possessed by the tenderer and/or (depending on the...”
Liste og kort beskrivelse av utvelgelseskriterier
Education and professional qualifications: The following education and professional qualifications are possessed by the tenderer and/or (depending on the requirements set in the notice or in the procurement documents) of the leading employees:
Vis mer
Liste og kort beskrivelse av utvelgelseskriterier:
“Environmental management measures: Tenderers can employ the following environmental management measures in connection with the execution of the contract:”
Liste og kort beskrivelse av utvelgelseskriterier:
“Number of employees in the management: The tenderer ́s number of employees in the management during the last three years was as follows:”
Liste og kort beskrivelse av utvelgelseskriterier:
“Average workforce: The tenderer's average annual workforce in the last three years has been as follows:”
Liste og kort beskrivelse av utvelgelseskriterier:
“Tools, materials and technical equipment.: Tenderers can use the following tools, material and technical equipment to carry out the contract:”
Liste og kort beskrivelse av utvelgelseskriterier:
“Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers....”
Liste og kort beskrivelse av utvelgelseskriterier
Portion of the contract to sub-suppliers.: The tenderer is considering to outsource the following part (as a percentage) of the contract to sub-suppliers. Note that if the tenderer has decided to outsource a part of the contract to sub-suppliers and will use the sub-suppliers ́ capacity to carry out this part, a special ESPD will be supplemented for such sub-suppliers, see part II, section C, above.
Utfyllende informasjon Klageinstans
Navn: Hordaland tingrett bergen
Nasjonalt registreringsnummer: 974 737 418
Postnummer: 5020
Poststed: Bergen
Land: Norge 🇳🇴
E-post: hordaland.tingrett@domstol.no📧
Telefon: 55 69 97 00📞 Informasjon om elektroniske arbeidsflyter
Elektronisk fakturering vil bli akseptert
Elektronisk betaling vil bli brukt
Kilde: OJS 2024/S 075-222166 (2024-04-15)
Kunngjøring av konkurranse (2024-05-21) Gjenstand Anskaffelsens omfang
Estimert verdi eksklusive mva: 9 800 000 NOK 💰
Varighet
Startdato: 2024-06-11 📅
Prosedyre Administrativ informasjon
Frist for mottak av tilbud eller forespørsler om deltakelse: 2024-05-27 10:00:00 📅
Vilkår for åpning av tilbud: 2024-05-27 10:00:00 📅
Endringer Annen tilleggsinformasjon
“Revised annex 4a has been added.”
Kilde: OJS 2024/S 098-301672 (2024-05-21)