The contracting authority invites tenderers to a contest for a contract for ‘detailed engineering design services, RIB, RIE, RIV and other disciplines for Gol sewage treatment facility’. A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations. The detailed engineering design services included in this contract include, amongst other things, the following disciplines and roles: • engineering design services for construction (RIB), including technical fire prevention engineering design services; • engineering design services HVAC and sanitary installations (RIV); • engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract; • engineering design services for other disciplines; • responsible applicant; • coordinator in the engineering design services (KP).
Frist
Fristen for mottak av tilbud var 2020-05-27.
Anskaffelsen ble publisert 2020-03-31.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2020-03-31) Gjenstand Anskaffelsens omfang
Tittel: Engineering design services for the construction of civil engineering works
Referansenummer: 20/4
Kort beskrivelse:
The contracting authority invites tenderers to a contest for a contract for ‘detailed engineering design services, RIB, RIE, RIV and other disciplines for Gol sewage treatment facility’.
A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations.
The detailed engineering design services included in this contract include, amongst other things, the following disciplines and roles:
• engineering design services for construction (RIB), including technical fire prevention engineering design services;
• engineering design services HVAC and sanitary installations (RIV);
• engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract;
• engineering design services for other disciplines;
• responsible applicant;
• coordinator in the engineering design services (KP).
The contracting authority invites tenderers to a contest for a contract for ‘detailed engineering design services, RIB, RIE, RIV and other disciplines for Gol sewage treatment facility’.
A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations.
The detailed engineering design services included in this contract include, amongst other things, the following disciplines and roles:
• engineering design services for construction (RIB), including technical fire prevention engineering design services;
• engineering design services HVAC and sanitary installations (RIV);
• engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract;
• engineering design services for other disciplines;
• responsible applicant;
• coordinator in the engineering design services (KP).
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Prosjektering av anleggsarbeid📦
Tilleggs-CPV: Ingeniørtjenester📦 Utførelsessted
NUTS-region: Buskerud
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
The contracting authority invites tenderers to a contest for a contract for ‘detailed engineering design services, RIB, RIE, RIV and other disciplines for Gol sewage treatment facility’.
A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations.
The detailed engineering design services included in this contract include, amongst other things, the following disciplines and roles:
• engineering design services for construction (RIB), including technical fire prevention engineering design services;
• engineering design services HVAC and sanitary installations (RIV);
• engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract;
• engineering design services for other disciplines;
• responsible applicant;
• coordinator in the engineering design services (KP).
The existing treatment facility at Gol receives municipal sewage water from Gol and the surrounding holiday cabin area, as well as effluent from Nortura's abattoir. The facility will now be altered to fulfil the requirements for secondary treatment. The facility will be dimensioned for 9 300 person equivalents (pe), measured as organic matter.
The existing treatment facility at Gol receives municipal sewage water from Gol and the surrounding holiday cabin area, as well as effluent from Nortura's abattoir. The facility will now be altered to fulfil the requirements for secondary treatment. The facility will be dimensioned for 9 300 person equivalents (pe), measured as organic matter.
A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations. The scope of the turnkey contract includes:
• technical treatment installations;
• steps, platforms and equivalent, for access to process equipment;
• demolition, disassembly and disposal of existing equipment, within the contract limit;
• electrotechnical equipment for operating own process, including automation.
The turnkey contractor's process system will be the premise provider that the detailed engineering design services for the rest of the facility must comply with. The process system and design of the facility are described in Part II — Contract documentation, which, in short, comprises the following:
The turnkey contractor's process system will be the premise provider that the detailed engineering design services for the rest of the facility must comply with. The process system and design of the facility are described in Part II — Contract documentation, which, in short, comprises the following:
• pre-treatment (grates, sand traps) and an equalising basin in an extension of the existing facility;
• new biological treatment stage in existing sludge basins;
• sedimentation in an existing sedimentation basin;
• establishment of a new thin base mud stock and base mud stock within existing basins;
• installation of a new thickener machine and use of existing base mud stock;
• new dewatering machine (centrifuge).;
• necessary support systems such as chemical dosing and pressurised air installations.
— engineering design services for construction (RIB), including technical fire prevention engineering design services;
— engineering design services HVAC and sanitary installations (RIV);
— engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract;
— engineering design services for other disciplines;
— responsible applicant;
— coordinator in the engineering design services (KP).
Further details on the scope are in Part II — Contract documentation.
Varighet: 30 måneder
Prosedyre
Rettslig grunnlag: 32014L0025
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: svensk 🗣️
dansk 🗣️ + 1 til
norsk 🗣️
Tilbudets gyldighetsperiode: 2020-08-25 📅
Dato for åpning av tilbud: 2020-05-27 📅
Tidspunkt for åpning av tilbud: 13:00
Kunngjøring om tildeling av kontrakt (2020-09-29) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The contracting authority invites tenderers to a contest for a contract for ‘detailed engineering design services, RIB, RIE, RIV and other disciplines for Gol sewage treatment facility’.
A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations.
The detailed engineering design services included in this contract include, amongst other things, the following disciplines and roles:
• engineering design services for construction (RIB), including technical fire prevention engineering design services
— engineering design services HVAC and sanitary installations (RIV)
• engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract
• engineering design services for other disciplines
• responsible applicant
• coordinator in the engineering design services (KP).
The contracting authority invites tenderers to a contest for a contract for ‘detailed engineering design services, RIB, RIE, RIV and other disciplines for Gol sewage treatment facility’.
A process contractor has already been contracted with a contract from in accordance with NS8407 (turnkey contract), who is currently in the detailed engineering design phase for their installations.
The detailed engineering design services included in this contract include, amongst other things, the following disciplines and roles:
• engineering design services for construction (RIB), including technical fire prevention engineering design services
— engineering design services HVAC and sanitary installations (RIV)
• engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract
• engineering design services for other disciplines
• responsible applicant
• coordinator in the engineering design services (KP).
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
• engineering design services for construction (RIB), including technical fire prevention engineering design services
— engineering design services HVAC and sanitary installations (RIV)
• engineering design services for electro/automation (RIE) for work that is not included in the turnkey contract
• engineering design services for other disciplines
• responsible applicant
The existing treatment facility at Gol receives municipal sewage water from Gol and the surrounding holiday cabin area, as well as effluent from Nortura's abattoir. The facility will now be altered to fulfil the requirements for secondary treatment. The facility will be dimensioned for 9300 person equivalents (pe), measured as organic matter.
The existing treatment facility at Gol receives municipal sewage water from Gol and the surrounding holiday cabin area, as well as effluent from Nortura's abattoir. The facility will now be altered to fulfil the requirements for secondary treatment. The facility will be dimensioned for 9300 person equivalents (pe), measured as organic matter.
• electro technical equipment for operating own process, including automation.
• new dewatering machine (centrifuge);
Tildeling av kontrakt
Dato for kontraktinngåelse: 2020-08-21 📅
Navn: Sweco Norge AS
Nasjonalt registreringsnummer: 967 032 271
Postadresse: Bjørnsjerne Bjørnsonsgate 86/92
Poststed: Drammen
Postnummer: 3044
Land: Norge 🇳🇴 Buskerud
🏙️
Internettadresse: http://www.sweco.no🌏