The raft is to be constructed out of concrete. It must function as a secure and suitable platform for mooring the entity's 3 working vessels. These will in time be replaced by electric vessels.
The raft must therefore include charging stations for electric vessels, storage facilities below deck, and be prepared for workshop/storeroom modules on the deck. The raft must have sufficient storage capacity to cover the needs of the technical department in the fairway unit.
Frist
Fristen for mottak av tilbud var 2020-06-24.
Anskaffelsen ble publisert 2020-05-19.
Kunngjøring av konkurranse (2020-05-19) Gjenstand Anskaffelsens omfang
Tittel: Transport equipment and auxiliary products to transportation
Referansenummer: 19/263
Kort beskrivelse:
“The raft is to be constructed out of concrete. It must function as a secure and suitable platform for mooring the entity's 3 working vessels. These will in...”
Kort beskrivelse
The raft is to be constructed out of concrete. It must function as a secure and suitable platform for mooring the entity's 3 working vessels. These will in time be replaced by electric vessels.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Varer
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS)
Felles innkjøpsordliste (CPV)
Kode: Transportutstyr og hjelpeprodukter til transport📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: Norge🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet