The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch. Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
Frist
Fristen for mottak av tilbud var 2018-01-05.
Anskaffelsen ble publisert 2017-11-15.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2017-11-15) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 17/96521
Kort beskrivelse:
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Bygge- og anleggsvirksomhet📦 Utførelsessted
NUTS-region: Hordaland
🏙️
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx.…
… 11,4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
… 11.4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into two operations per bridge. A degree of minor works must also be expected on private properties.
Varighet: 33 måneder
Beskrivelse av opsjoner:
Askøy kommune shall determine if they wish to trigger the option road to Solsnes. Approx. 250 m of the road shall be repaired. It shall transform from being a single lane, to allow two vehicles to pass.
Utførelsessted
Hovedsted eller utførelsessted: Askøy, Norway.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: See the tender documentation.
Kontraktutførelse
Vilkår for kontraktoppfyllelse: See the tender documentation.
Prosedyre
Tidspunkt for mottak av tilbud: 12:00
Språk som tilbud eller forespørsler om deltakelse kan sendes inn på: norsk 🗣️
Tilbudets gyldighetsperiode: 2018-03-01 📅
Dato for åpning av tilbud: 2018-01-05 📅
Tidspunkt for åpning av tilbud: 13:00
Sted: Statens vegvesen [The Norwegian Public Roads Administration], Askedalen 4, Postal Address 6863.
Tilleggsinformasjon: Open tender contest.
Tilleggsinformasjon (2017-12-07) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to two lanes. A new water and sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11.4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into two operations per bridge. A degree of minor works must also be expected on private properties.
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to two lanes. A new water and sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11.4 m x 9.0 m (w/l) and Strømsnes III approx. 11,0 m x 26,0 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into two operations per bridge. A degree of minor works must also be expected on private properties.
Metadata for kunngjøring
Dokumenttype: Tilleggsinformasjon
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to two lanes. A new water and sewage installation shall also be lain in the new footpath along the entire stretch.
The contract work comprises the expansion of the existing road on a stretch of approximately 3.3 km. A new footpath shall be established along the entire route and the road shall be expanded to two lanes. A new water and sewage installation shall also be lain in the new footpath along the entire stretch.
Kilde: OJS 2017/S 238-495221 (2017-12-07)
Kunngjøring om tildeling av kontrakt (2018-04-14) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
The contract work comprises the expansion of the existing road on a stretch of approximately 3,3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9 m (w/l) and Strømsnes III approx. 11 m x 26 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
The contract work comprises the expansion of the existing road on a stretch of approximately 3,3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9 m (w/l) and Strømsnes III approx. 11 m x 26 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
The contract work comprises the expansion of the existing road on a stretch of approximately 3,3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
The contract work comprises the expansion of the existing road on a stretch of approximately 3,3 km. A new footpath shall be established along the entire route and the road shall be expanded to 2 lanes. A new Water and Sewage installation shall also be lain in the new footpath along the entire stretch.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9 m (w/l) and Strømsnes III approx. 11 m x 26 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
Large sections of the existing road are planned to be included as part of the new road. Traffic deviation in the project will be demanding, as there is dense settlement along the entire project. The road is a school road and particular consideration must be given to cyclists and pedestrians. The project includes the demolition and establishment of two smaller bridges. The size of these at Strømsnes II is approx. 11,4 m x 9 m (w/l) and Strømsnes III approx. 11 m x 26 m (w/l). To manage the traffic, the Norwegian Public Roads Administration has decided to divide the bridges into 2 operations per bridge. A degree of minor works must also be expected on private properties.
Utførelsessted
Hovedsted eller utførelsessted: Askøy.
Tildeling av kontrakt
Dato for kontraktinngåelse: 2018-02-16 📅
Kilde: OJS 2018/S 074-166011 (2018-04-14)