Construction schedule and description for cross road and Ringvegen in Jessheim

Statens vegvesen Region øst

The assignment consists in designing a part of a new cross road in Jessheim under the railway as well as designing a road junction and various initiatives in Ringvegen. Construction schedule for handling cables, pipelines, railway installations, concrete construction, noise, landscape etc. are included. A construction schedule and technical description for the tender documents shall be worked out in accordance with Statens vegvesen’s handbook 025 and 026. Some follow up in the construction phase is included.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=226905.

Frist

Fristen for mottak av tilbud var 2011-05-27. Anskaffelsen ble publisert 2011-04-01.

Leverandører

Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2011-04-01 Kunngjøring av konkurranse
2011-08-19 Kunngjøring om tildeling av kontrakt
Kunngjøring av konkurranse (2011-04-01)
Gjenstand
Anskaffelsens omfang
Tittel: engineering design services for the construction of civil engineering works
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Tjenester
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Prosjektering av anleggsarbeid 📦

Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regional eller lokal myndighet
Postadresse: Postboks 1010
Postnummer: 2605
Poststed: Lillehammer
Kontakt
Internettadresse: http://www.vegvesen.no 🌏
E-post: alf.gotuholt@vegvesen.no 📧
Telefon: +47 81522000 📞

Referanse
Datoer
Sendt dato: 2011-04-01 📅
Innleveringsfrist: 2011-05-27 📅
Publiseringsdato: 2011-04-06 📅
Identifikatorer
Kunngjøringsnummer: 2011/S 67-109395
OJ-S-utgave: 67
Tilleggsinformasjon
The Purchasing Authority is acting on behalf of the following organisations: Ullensaker municipality. (NT Ref:227440).

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
The assignment consists in designing a part of a new cross road in Jessheim under the railway as well as designing a road junction and various initiatives in Ringvegen. Construction schedule for handling cables, pipelines, railway installations, concrete construction, noise, landscape etc. are included. A construction schedule and technical description for the tender documents shall be worked out in accordance with Statens vegvesen’s handbook 025 and 026. Some follow up in the construction phase is included.
Vis mer
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=226905.
Utførelsessted
Hovedsted eller utførelsessted: Jessheim, Ullensaker municipality, Norway.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
(1) Company registration certificate.
(2) Value added tax certificate (National requirement).
(3) Company tax certificate (National requirement).
(4) Self-declaration in compliance with Appendix 2 (HSE) of the Norwegian procurement regulations (National requirement).
Økonomisk og finansiell stilling:
(1) Other documentation required (please state below).
Annual accounts with the auditor's statement for the last 2 years.
Teknisk og faglig kapasitet:
(1) Manpower proposed for this contract (organisation chart) with names and CV's of the key personnel who will be responsible for its execution (for service and works contracts).
(2) A list of the principal deliveries effected, or main services provided, by the company, in the past 3 years, with the values, dates and recipients (for supply and service contracts).
Kontraktutførelse
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See the tender documents.
Personalets navn og faglige kvalifikasjoner ✅

Prosedyre
Tilbudets gyldighetsperiode: 2011-08-12 📅
Språk
Andre språk: Norwegian.

Oppdragsgiver
Identitet
Navn på tildelende myndighet: Statens vegvesen region øst
Anskaffelsen utføres på vegne av andre oppdragsgivere ✅
Kontakt
Kontaktpunkt: Fylkesavdeling Akershus - Utbygging Romerike
Alf S. Gotuholt
Internettadresse: www.vegvesen.no 🌏
Adresse til kjøperprofilen: http://www.doffin.no//search/Search_AuthProfile.aspx?ID=AA3384 🌏
Navn: Statens vegvesen region øst
Postadresse: Brøtergata 1
Poststed: Lillestrøm
Postnummer: 2000
Telefon: +47 91170223 📞
URL for ytterligere informasjon: www.vegvesen.no 🌏
URL for dokumenter: www.vegvesen.no 🌏
URL for deltakelse: www.vegvesen.no 🌏

Referanse
Datoer
Startdato: 2011-07-06 📅
Sluttdato: 2011-11-23 📅
Tilleggsinformasjon
The Purchasing Authority is acting on behalf of the following organisations:
Ullensaker municipality.
(NT Ref:227440).
Kilde: OJS 2011/S 067-109395 (2011-04-01)
Kunngjøring om tildeling av kontrakt (2011-08-19)
Gjenstand
Anskaffelsens omfang
Totalverdi for anskaffelsen: 6 000 000 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt

Prosedyre
Tilbudstype: Ikke aktuelt

Oppdragsgiver
Identitet
Postadresse: Postboks 1010,

Referanse
Datoer
Sendt dato: 2011-08-19 📅
Publiseringsdato: 2011-08-24 📅
Identifikatorer
Kunngjøringsnummer: 2011/S 161-265523
Refererer til kunngjøring: 2011/S 67-109395
OJ-S-utgave: 161
Tilleggsinformasjon
The Purchasing Authority is acting on behalf of the following organisations: Ullensaker Municipality. (NT Ref:237696).

Gjenstand
Utførelsessted
Hovedsted eller utførelsessted: Jessheim, Ullensaker Municipality, Norway.

Prosedyre
Tildelingskriterier
Kriterium: 1. Price (60 %)
2. Implementation, resources (20 %)
3. Total competence, experience (20 %)

Tildeling av kontrakt
Dato for kontraktinngåelse: 2011-06-23 📅
Postadresse: Hvamstubben 14
Poststed: Skjetten
Postnummer: 2013
Land: Norge 🇳🇴
Informasjon om tilbud
Antall mottatte tilbud: 1
Kilde: OJS 2011/S 161-265523 (2011-08-19)