Leverandør: Satema

Én arkivert anskaffelse

Nyeste anskaffelser der leverandøren Satema nevnes

2012-06-11   Back-up power installations for Midgardsormen (Oslo Kommune, Vann- og avløpsetaten)
Complete back-up power installations (1000 kVA) shall be delivered and assembled for a new pump station for Midgardsormen in Bekkelaget treatment plant. The installations shall consist of a diesel aggregate and control cupboard, assembled in an aggregate room approx. 100m from the tunnel mouth. Cooling radiator with heat exchangers and pipes from the aggregate room are led to an area outside the tunnel mouth. Option items for transformers for high voltage operation of the plant are included. Note: To … Vis anskaffelsen »
Nevnte leverandører: Satema