2019-09-19D43 Overhead Line System (OCS) (Bybanen Utbygging)
D43 Overhead Linr System:
Contract D43 includes the completion of detailed design, supply, installation, test and commissioning of all equipment for the Overhead Line System for the entire BT4 project.
The line will be approximately 9 km of double track, 6 parking lanes in Løvestakken and a parking lane in Kaigaten.
Interconnection to the existing line (BT1) shall take place at Bystasjonen and Kronstad.
Supplier’s participation costs:
Costs that the supplier incurs in connection with the preparation, …