2019-05-20Seaward Approach Bodø — Part II — Deepening and Disposal (Kystverket)
A wider seaward approach to Bodø and a deeper sailing depth are planned. This includes the deepening of 3 banks in the seaward approach to Bodø harbour as well as the dredging of a larger field inside Bodø harbour
The polluted seabed sediments and parts of the clean dredged material must be disposed at a waterside disposal built by cell piles with side fillings. The surplus of clean dredged materials shall be dropped in the sea disposal site.
Vis anskaffelsen » Nevnte leverandører:Consto Anlegg Nord AS
2018-04-16County Road 17/720 Dyrstad — Sprova — Malm. E-5 Fv. 17 Østvik — Beitstadsundet (Statens vegvesen)
The contract includes the construction of a 2,4 km new county road (Fv.) 17 and associated local roads between Østvik and Beitstadsundet. The construction area for county road (fv.) 17 starts at profile 1940 at Østvik and ends at profile 4350 at abutment axis 1 for the Beitstadsund Bridge. All disciplines as concrete works, electro technical installation, drainage, asphalting, road marking and assembling railings are included in the contract.
A bridge and four culverts shall be constructed for the …
Vis anskaffelsen » Nevnte leverandører:Consto Anlegg Nord AS