2019-04-25County Road 110 Foot/Cycle Path Begby-Borge (Statens vegvesen)
A foot and cycle path shall be construction from the roundabout Begby to Borge school. The road must be subject to pavement widening and shall partly be constructed in a new curve from profile 0 at the roundabout to profile 1 000.
The road shall also be constructed outside of the burial ground as a new road from approximately profile 1 000 to approximately profile 1 800. The project is a design-based project. Contracts shall not be transferred. The road works shall be initiated from summer 2019 until …