2016-10-21Parallel framework agreements — consultancy services within development and operation (Oljedirektoratet)
The Norwegian Petroleum Directorate needs consultancy services that can strengthen and supplement our internal competence within the disciplines mentioned below. This is to strengthen OD's capacity and competence to be an initiator for the development of finds and the implementation of measures for fields in operation.
The competition is aimed at professional environments who can carry out assignments within the following technological areas:
— Underground technology, reservoir geology and reservoir …
Vis anskaffelsen »
2014-12-17Shallow drilling in the Barents Sea (Oljedirektoratet)
The Norwegian Petroleum Directorate (abbreviated and henceforth referred to as OD) shall execute shallow drilling in the Barents Sea. This is a part of a geological mapping of this maritime zone. The data acquisition is administered by OD and financed through the Ministry of Petroleum and Energy.
OD will collect geological core materials from the Barents Sea during late summer/early autumn 2015. The objective is to collect geological information from this area. OD is planning drilling of 5 shallow drill …
Vis anskaffelsen » Nevnte leverandører:Fugro Geotechnics AS
2012-10-10Shallow drillings at the Jan Mayen ridge summer 2013 - (2) (Oljedirektoratet)
Summer 2013, the Norwegian Petroleum Directorate (OD), henceforth referred to as the Awarding Authority, plans to conduct core drilling at the Jan Mayen ridge (south of the island Jan Mayen) where the objective is to increase the knowledge of the geology in the area. The plan includes drilling of shallow holes (less than 200 m below the seabed at Jan Mayen). The Awarding Authority expects drilling of approx. 6 drilling holes with an operation period of 40 days.
The water depth in the area varies between …
Vis anskaffelsen »
2012-06-26Shallow drilling at the Jan Mayen ridge summer 2013 (Oljedirektoratet)
In summer 2013 the Norwegian Petroleum Directorate (OD), henceforth referred to as the Awarding Authority, is planning to carry out core drillings at the Jan Mayen ridge (south of the Jan Mayen Island). The objective is to increase the knowledge of the geology in the area.
The plan is to drill shallow drilling holes (shallower than 200 m below the sea bed). It is expected to be drilled approx. 6 of these drilling holes with an operation time of approx. 40 days.
The water depth in the area varies between …
Vis anskaffelsen »