Anskaffelser: Arbeider i forbindelse med elvebredder

3 arkiverte anskaffelser

Arbeider i forbindelse med elvebredder har blitt anskaffet av organisasjoner som Norges vassdrags- og energidirektorat (NVE) og Bymiljøetaten, Oslo kommune.
Historisk har leverandører innenfor dette området vært Oslo Vei As og WSP Norge AS (hovedenhet).

Nyeste anskaffelser av arbeider i forbindelse med elvebredder i Norge

2023-03-14   Flood protection in the centre of Mjøndalen (Norges vassdrags- og energidirektorat (NVE))
The procurement is for securing the Vika quick clay zone in Mjøndalen. The work involves filling and erosion protection in a ravine with a stream in such a way that it protections agates quick clay landslides and erosion from the stream. Site inspection/information meeting 22.3.2023, at 13.00. Vis anskaffelsen »
2021-05-10   Contract for Construction Manager for Measures after a Quick Clay Landslide in the Centre of Ask, Gjerdrum Municipality (Norges vassdrags- og energidirektorat (NVE))
The Norwegian Water Resources and Energy Directorate (Norwegian: NVE) requests tender for construction management for the implementation of measures subsequent to the quick clay landslide at Ask in Gjerdrum municipality on 30 December 2020. The contract period has a duration from the date the contract is signed and it is expected to be valid until September 2023. The Norwegian Water Resources and Energy Directorate (Norwegian: NVE) is assisting Gjerdrum municipality with the planning and implementation … Vis anskaffelsen »
Nevnte leverandører: WSP Norge AS (hovedenhet)
2011-12-08   70-SAM-2011 Tiedemannsparken - foot and cycle bridge over Grenseveien (Bymiljøetaten, Oslo kommune)
Contract work: — New foot and cycle path bridge over Grenseveien, total width 6,0 m and length 167,5 m. The longest span between the axes is 25.0 m above the Grenseveien. We have planned for an in-situ cast slim bridge. The biggest challenge in the construction of the bridge is the amount of existing high voltage cables close to all foundations. Also, the bridge will not be built using traditional abutments as there must be access to the existing high voltage cables, where the bridge ends, — Construction … Vis anskaffelsen »
Nevnte leverandører: Oslo Vei As