2020-08-25   Framework Agreement for Electricity Cables and Fibre Cables (Varanger Kraft AS, med to andre kraftlag)
The contracting authority is: Varanger Kraft AS — with subsidiary companies Alta Kraftlag SA — with subsidiary companies Norkyn Kraft SA. The contracting authority intends to enter into a framework agreement for the procurement of high and low current cables, and fibre cables. The intention is to sign a framework agreement for a period for up to 3 years. Vis anskaffelsen »
2020-01-30   Onshore Electricity Plant (Sandnes kommune)
The Contracting Authority wants to enter into a purchasing agreement for a complete onshore electricity plant, including works and high voltage installations. The plant shall be established at the quay at Strandgata 151, 4307 Sandnes. Vis anskaffelsen »
Nevnte leverandører: Blueday Technology AS
2014-07-11   Electrical fiber optic cable (Havforskningsinstituttet)
The Norwegian Institute of Marine Research's (IMR) needs new electro-optical cables for its MUST (Multi-Usage System for Towed vehicle) vessel on the "G.O. Sars" research vessel. MUST is used for mapping and volume measurement of fish and zooplankton, and collecting information from a variety of sensors. The multi-sensor system consists of a 5-channel synchronous sonar system, laser optical plankton measurer, video plankton measurement system, CTD probe, light meters, turbidity sensor, fluorescence … Vis anskaffelsen »
Nevnte leverandører: MacArtney Norge AS