2011-07-20S&L, Trondheim Airport Værnes, electrical engineering work, AP 3 (Avinor AS)
The work comprises up to.
Ring cables: Approx. 60 000 m.
Lighting points. Approx. 500.
Tele cables: Approx. 6 000 m.
Power cables: Approx. 4 000 m.
All work is in close proximity to the runway, and therefore some of the work shall be carried out during the night in the period 10.4.2011-30.6.2012, and 15.8.2011-31.10.2012.
The scope of the work may change.
Selected supplier for this enterprise will be working with selected supplier for the support work of electro and overwater …