Anskaffelser: Trondheim Havn

5 arkiverte anskaffelser

Nyeste anskaffelser av Trondheim Havn

2017-10-10   Pre-qualification — Site for shipping lime products, Verdal (Trondheim Havn)
The project will consist of the construction of a new quay with dredging off the quay, shortening or possibly changing a breakwater to the west of the quay, development of a jetty around the filling to the south of the site and the development of the harbour area inside the quay, with the necessary technical infrastructure and roads. Vis anskaffelsen »
Nevnte leverandører: Stjern Entreprenør As
2014-05-14   Framework agreement electrical service work (Trondheim Havn)
Trondheim Havn IKS shall enter into a framework agreement for service work, electrical installations and odd maintenance work within electro. A full description of the delivery is in annex 1 of the contract – Specifications. Vis anskaffelsen »
2014-05-08   Framework agreement for the hire of machines (Trondheim Havn)
The Port of Trondheim would like a permanent supplier for the hire of excavation machines, wheelloaders and ground works for assignments by the hour, with operator. A full description of the delivery is in annex 1 of the contract – Specifications. Vis anskaffelsen »
2014-05-07   Framework agreement: Procurement of steel works (Trondheim Havn)
The Port of Trondheim shall enter into a framework agreement for steel works. This involves welding and steel plate work at the Port of Trondheim's buildings, quays and port installations. A thorough description of the delivery is in Appendix 1 of contract – Specifications. Vis anskaffelsen »
2011-07-11   Trondheim Port - New High-Speed Crafts terminal - Foundation, concrete and piling works (Trondheim Havn)
Trondheim port shall relocate the high speed crafts terminal. The existing terminal is situated farthest in, in the Brattøra pool. New terminal shall be constructed approx. 200 m farther west in the pool. An approx. 80 m long pier has completed from the Brattøra harbour on the south side of the Brattøra pool facing north-west. This contract includes: — caisson and retaining walls at the north end of the new pier, — abutment for landing from floating stages, — collecting tub for new fuel and oil tanks, — … Vis anskaffelsen »