Anskaffelser: Tromsø Havn KF

5 arkiverte anskaffelser

Historisk har leverandører til Tromsø Havn KF vært Dr. Techn. Olav Olsen As, Multiconsult AS og Norconsult As.

Nyeste anskaffelser av Tromsø Havn KF

2014-08-08   Prostneset port terminal with office building (Tromsø Havn KF)
Prostneset shall be developed with a total of three buildings: — The port terminal: Regulated gross area 6 300 + 3 850 m² that will house a goods terminal, bus terminal and passenger terminal with service functions for travellers. — Offices for Tromsø Havn KF: Regulated gross area 1 000 m² and will primarily house office premises. — The business building 'Amundsengården': Regulated gross area 2 800 m² and shall include offices and business premises for rent. The contract will be based on a turnkey model … Vis anskaffelsen »
2014-08-05   Prostneset port terminal with office building (Tromsø Havn KF)
Prostneset shall be developed with a total of three buildings: — The port terminal: Regulated gross area 6 300+3 850 m² that will house a goods terminal, bus terminal and passenger terminal with service functions for travellers, — Offices for Tromsø Havn KF: Regulated gross area 1 000 m² and will primarily house office premises, — The business building “Amundsengården“: Regulated gross area 2 800 m² and shall include offices and business premises for rent. The contract will be based on a turnkey model in … Vis anskaffelsen »
2012-01-12   Wheel loader Tromsø Port (Tromsø Havn KF)
Wheel loader weight approx. 20 tons. Various equipment and service contract. Vis anskaffelsen »
2012-01-09   Technical consultancy services Tromsø Port (Tromsø Havn KF)
Consultancy services related to project management, construction management and engineering design for the development, maintenance and modification within Tromsø Port's area of activities. Vis anskaffelsen »
2011-10-12   Grøtsund Industry Park, construction stage 1 (Tromsø Havn KF)
Quay 130 m with water depth 22 m at the quay front. Option: Quay 70 m and ramp, water depth 12 m. Terminal area 80 000 m2 shall be developed. Delivery of stone matter: Approx 240 000 m3. Delivery of other uncompacted matter 140 000 m3. Excavation and removal of matter from site 130 000 m3. Dredging approx. 60 000 m3. All matter shall be transported by sea. The tender documents will be sent out to all interested tenderers at the same time after the deadline for registration for the competition has … Vis anskaffelsen »