2026-04-15Deadline 2026-06-01New landfill area Kjevikdalen (Norconsult Norge AS)
Nordhordland and Gulen Intermunicipal Sanitation Company (NGIR) shall expand their landfill area and must therefore establish new bottom and side sealing. A vertical concrete wall must thus be established in the north-eastern corner of the new area, in addition to laying out layers of different matter and cloths. Including bentonite and HDPE membranes. Furthermore, the plant shall be able to have good control of all water that comes in, which results in a considerable number of pipes divided between …
Vis anskaffelsen »
2026-04-09Deadline 2026-05-18Electro contract at Frier Vest harbour terminal. (Norconsult Norge AS)
The electro contract will be executed as a turnkey contract in accordance with NS 8407, based on the attached function description. When the contract is signed, the contract is planned to be transported to the turnkey contractor for the 'Development terminal area - phase 1'. Turnkey contractor phase 1 is establishing ditches, conduits/cable routes and other infrastructure in the ground, delivers technical house and assembles light masts (interface with electro). The electrical contractor designs and …
Vis anskaffelsen »
2026-02-05Courter Vest Havneterminal - development terminal area (Norconsult Norge AS)
Grenland Havn IKS is in the process of developing Frier Vest Havneterminal, which is being built in several phases. The terminal will function as a vital part of Grenland ́s industry. This procurement is for the development of the terminal area and it will be carried out as an open tender competition.
Vis anskaffelsen » Nevnte leverandører:Hauk Sveinsson AS
2024-03-21Land power - Container and control panel - Grenland Port (Norconsult Norge AS)
Grenland Havn IKS (GH) would like to procure facilitation for land power supply of Northern Lights CCS ships that shall have scheduled calls to the Brevik terminal. As a part of this, adaptations are made on land to meet the ship ́s needs. This enquiry is for the complete delivery of land power containers, placed inside the terminal, as well as the control panel for operating on the quay.
Vis anskaffelsen »