2020-04-15Reception Building, Port (Longyearbyen lokalstyre)
Reception building at the port of Longyearbyen. The total area is 496 m in two floors. The ground floor shall contain reception facilities for guests who are arriving Longyearbyen by sea. The first floor shall contain offices and meeting rooms.
Vis anskaffelsen »
2020-01-14Large scale battery storage system, Longyearbyen (Longyearbyen lokalstyre)
At 78 N, 15.62 E, the project is located in one of the northernmost populate areas in the world. Longyearbyen has around 2 400 residents and the electricity supply is primarily facilitated by a coal-fired thermal power plant.
Longyear energiverk [Longyear power plant] now wants to install a battery store to increase operational reliability and reduce the environmental emissions at the power plant.
The expectations and objective of a battery park are as follows:
— able to supply the reserve capacity to …
Vis anskaffelsen »
2019-07-12New Back-Up Power Station (Longyearbyen lokalstyre)
Electricity and district heating is normally provided by Longyear Electric Board. When there are operational problems at Longyear Electric Board, electricity and district heating is provided by a back-up power aggregate and boilerhouse. The current back-up power supply can only provider approx. half of the power requirement for Longyearbyen, and the situation is precarious.
The local council has decided to expand the existing back-up power capacity with approx. 6 MW (PS 33/2019). The system must be …
Vis anskaffelsen » Nevnte leverandører:Pon Power AS