2026-02-05Construction of stand for ONS 2026 (Havindustritilsynet)
Havindustritilsynet shall be able on ONS 2026, which will be held in Stavanger Forum in the period 24 - 27.08.2026. The stand shall be located in hall 8 and it has a size of 12.5 m x 7.5 m. This procurement consists of developing/constructing the stand in accordance with further specified specifications. Havtil is responsible for the creative work of developing the concept, making drawings, coordinating the construction and being responsible for the actual production of the exhibition.
Vis anskaffelsen »
2025-10-08Framework agreement for performance management in Havtil. (Havindustritilsynet)
The objective of the framework agreement is to strengthen Havtil with extra capacity and competence in development work within financial management, performance management, project management and strategy work. The framework agreement includes assistance with development and follow-up of strategy, as well as various projects within finance, business and project management. The work shall build on previous development projects where relevant, and give Havtil increased capacity and professional support in …
Vis anskaffelsen »
2025-04-04Framework agreement for translation to English for the Norwegian Sea Industry Supervisory Authority's website. (Havindustritilsynet)
This assignment is for translation to English of texts on our website (bokmål and nynorsk), which is related to the practice of the authority role. Texts that are translated will be published on Havtil ́s websites and they include various news articles, reports, technical articles, etc. The texts are mainly news texts and quick delivery is therefore important. Most of the texts are short, up to one A4 page. The number of assignments will estimated be 15 -20 per month. Longer texts, for example …
Vis anskaffelsen »
2025-03-13Interaction and management of projects, modifications and maintenance in operation. (Havindustritilsynet)
A report shall be prepared that covers, but is not limited to: Data basis for identifying and classifying work scope and the interface for maintenance work, modifications and projects. Possible indicators of problems and measures of relevance to health, environment and safety in connection with interaction and management of projects, modifications and maintenance in operation identified indicators, underlying causes, teaching points and recommendations on measures. Summary and reference of previous …
Vis anskaffelsen »
2024-09-04Technical integrity of connections in pipelines and submarine installations. (Havindustritilsynet)
Joints between pipes to pipes and pipes to equipment can mainly be either welding or mechanical joints ("non-welded"). Bolted flange connections are mostly used by the mechanical compounds, but there are several variants that are requested to be described in this assignment. Traditionally, welded connections are the preferred. For design, installation reasons or operationally, mechanical connections are to be used. We would like a general assessment of the integrity of the different connections and what …
Vis anskaffelsen »