2018-07-14Aukra arts centre and swimming pool Turnkey contract with solution proposal (Hammerø and Storvik Prosjekt AS)
Aukra kommune shall develop and erect a new Arts Centre and swimming pool with a provisional programmed net area of approx. 3 100 m and 312.5 m water surface.
Aukra Kulturhus og basseng [Aukra Arts Centre and Swimming Pool] will consist of the following primary functions:
— Foyer
— Swimming facility
— Halls with support functions
— Library
— Volunteer Centre
— Cultural School
The procurement process will be carried out in the following steps:
— Pre-qualification and selection of up to 3 contractors who …
Vis anskaffelsen »
2018-07-12Delivery of rock (Hammerø and Storvik Prosjekt AS)
The delivery of rock to the square and the Sea front in Molde. The rock shall be of equivalent type (colour and appearance) as the rock that was placed on the Town hall place (2004).
Vis anskaffelsen »
2018-06-02Aukra arts centre and swimming pool Architect and consultants (Hammerø and Storvik Prosjekt AS)
The builder needs to engage builder consultants to assist with:
— the preparation of the tender documentation, mainly function descriptions,
— option: follow-up of the turnkey competition (questions and answers),
— option: evaluation of the project proposal,
— option: interaction phase,
— option: detailed engineering design servies and the construction phase,
— option: hand-over and claims.
The competition is for the following consultants (lots):
— architect (ARK),
— geotechnics,
— HVAC and sanitation …
Vis anskaffelsen »
2016-12-20The sea front in Molde (Hammerø and Storvik Prosjekt AS)
Molde is being proactive in its aim of being 30 000 inhabitants through a focus on, amongst other things, town centre development. Molde town shall, thus, get a new gathering and recreation area along the sea front in the town centre. This includes an expansion of the quay width and an upgrade of the standard of the quay area's surfaces.
This competition is for a general contract for the Sea Front Molde.
Vis anskaffelsen »