2025-06-19   Flytekai with rigging rigs in Rypefjord fishing marina. (Hammerfest Havn KF)
This tender contest is for complete engineering design services, delivery and assembly of a grand quay of approx. 88 m of rigging rigs in Rypefjord fishing marina. Vis anskaffelsen ยป
2021-02-23   Quay at Fuglenes (Hammerfest Havn KF)
The objective is to enter into a contract for the expansion of the current quay front at Fuglenesterminalen in Hammerfest. A comprehensive description of the assignment is given in the tender documentation and associated annexes. Vis anskaffelsen ยป
2020-06-16   Port Vessel, Recently Used (Hammerfest Havn KF)
Hammerfest havn [the Port of Hammerfest] wants tenders for a work vessel of a minimum 13 metres and maximum 14.99 metres with a large work deck, crane, and heavy machinery. The vessel must be of the type catamaran with a wheelhouse in the front with a deck house on the port side. The vessel must be a multi-purpose vessel and shall be used for towing, maintenance of the port's installations, and rescue missions as a public service. The vessel shall be in operation all year round with the weather and โ€ฆ Vis anskaffelsen ยป
2020-05-21   Port Vessel, Recently Used (Hammerfest Havn KF)
Hammerfest havn [the Port of Hammerfest] wants tenders for a work vessel of a minimum 13 metres and maximum 14.99 metres with a large work deck, crane, and heavy machinery. The vessel must be of the type catamaran with a wheelhouse in the front with a deck house on the port side. The vessel must be a multi-purpose vessel and shall be used for towing, maintenance of the port's installations, and rescue missions as a public service. The vessel shall be in operation all year round with the weather and โ€ฆ Vis anskaffelsen ยป
2020-02-05   Express work boat (Hammerfest Havn KF)
Hammerfest havn [the Port of Hammerfest] wants tenders for a work vessel of a minimum 15 metres and maximum 14,99 metres, express and with a large work deck, crane, yardarm, bow port and heavy machinery. The vessel must have mono hulls and an aft wheelhouse as well as the necessary navigation equipment. The vessel must be a multi-use vessel and will be used for cargo transport, towing of smaller vessels (pull and push), maintenance of the port installations, rescue assignments and as emergency โ€ฆ Vis anskaffelsen ยป
2018-01-26   Framework agreement, project management (Hammerfest Havn KF)
Hammerfest havn KF needs to hire project management services for several future and existing projects. This will apply to all project phases (early phase, preliminary phase, detailed phase, execution phase and completion phase). Vis anskaffelsen ยป